Laserfiche WebLink
LLNL Emergency Plan <br />Rev-23 <br />October 2017 <br /> <br /> 86 <br /> <br /> <br />Figure 8.1 One-mile Emergency Planning Zone Around Site 200 <br />8.5 Communication <br />While the EMDO is able to monitor via radio activities directed by the IC, including initial <br />protective measures for affected onsite personnel and offsite residents based on the initial size- <br />up, the IC and EMDO will communicate via a telephone conversation to verify that the initial <br />protective measures are consistent with the protective actions contained in the applicable EAL. <br />Following activation and operations of the EOC, the Fire Department will communicate with the <br />EOC through the EOC Operations Section, although the IC and ED will communicate with each <br />other directly, at least initially, to communicate responsibilities and define what portion of the <br />site is considered the incident scene that the IC will retain responsibility for protecting, and the