Laserfiche WebLink
LLNL Emergency Plan <br />Rev-23 <br />October 2017 <br /> <br /> 87 <br />balance of the site the ED will be responsible for protecting. Any protective action decisions for <br />onsite personnel determined by the EOC should be coordinated with the IC. Protective actions <br />for the public may be ordered only by public officials or their designees (e.g., ACFD, LPD); the <br />EMDO/ED will make protective action recommendations only, which will be communicated to <br />offsite officials both on Emergency Notification forms and via telephone conversations with the <br />IC and local/state officials. <br />8.6 Termination of Protective Actions <br />During an Operational Emergency, onsite protective actions will be modified or lifted at the <br />direction of the ED following recommendation by the IC. This information will be <br />communicated to appropriate onsite emergency response and facility personnel through <br />established emergency communication systems. Changes to recommendations for affected offsite <br />agencies will be communicated per Emergency Programs Organization plans/procedures <br />following any necessary coordination with local decision-makers. <br />8.7 Emergency Shutdown of Operations <br />Emergency shutdown of operations in facilities should be performed, where practicable and it is <br />safe to do so. If this is not feasible, shutdown will be performed by knowledgeable emergency <br />response personnel. <br />Site response guides and facility procedures (e.g., Safety Plans – including Facility Safety Plans <br />and Integration Work Sheets) address shutdown for normal operations and emergencies. These <br />procedures, which are developed and maintained by facility personnel and reviewed by the <br />cognizant ES&H Team, are available to assist the operators in placing the building in a safe <br />condition.