Laserfiche WebLink
LLNL Emergency Plan <br />Rev-22 <br />January 2017 <br /> <br /> 32 <br />EOC Activation Levels <br />There are two formal staffing activation levels for the EOC: <br />Key - The EOC is activated with key staff. <br />Note: Additional EOC staffing decisions are dependent on the circumstances surrounding <br />the event. <br />Full - The EOC and appropriate DOCs are fully staffed. Full EOC activation is required due to a <br />major emergency, such as an earthquake, significant hazardous materials release, or terrorist <br />event. <br />Activation is required for emergencies classified as Site Area Emergency or General Emergency. <br />For Alert, Operational Emergency Not Requiring Further Classification, or a significant situation <br />not classified as an Operational Emergency, the decision on whether to activate is at the <br />discretion of the LEDO, in consultation with the EMDO. <br />EOC/ERO Stand-by Mode <br />The ERO and their facilities (i.e., EOC, DOCs) are normally in stand-by status where they are <br />fully ready and capable to be activated and become operational. They may also be placed in a <br />status by the LEDO to actively monitor an emergency incident that is not an Operational <br />Emergency or of significant magnitude to warrant an activation of the EOC or ERO. <br />