My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:57:11 PM
Creation date
8/24/2018 6:23:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516198
PE
2832
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0516198\COMPLIANCE INFO 2000 - 2016 .PDF
QuestysFileName
COMPLIANCE INFO 2000 - 2016
QuestysRecordDate
12/19/2017 10:45:19 PM
QuestysRecordID
3750331
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209) 468-3433 Web:www.sLgov.org/ehd/unitiii.html <br /> CONTINUATION FORM Page: 5 of fc? <br /> OFFICIAL INSPECTION REPORT Date: 11/18/10 <br /> Facility Address: Jimco Truck Plaza 1022 East Frontage Road, Ripon Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Routine Aboveground Petroleum Storage Tank inspection Followup continue <br /> # 21. Failed to show secondary containment for the four 20,000 gallon diesel AST is sufficient. The Plan <br /> does not address the issue this issue. Secondary containment must be "sufficiently impervious" for the <br /> entire secondary containment: retaining walls, dike/ berms, floors, so that discharge from primary <br /> containment system will not escape containment before cleanup occurs and that it is sufficient to hold <br /> precipitation freeboard. Correct by providing documentation in the Plan that address this information. <br /> # 24. Listing of emergency contact phone numbers incomplete and not current. Owner/ operator direct <br /> cell phone number not current. Jimco Manager's name is spilled incorrectly in several areas of the Plan. <br /> Contact listing lacks phone numbers for National Response Center, cleanup contractors with whom you <br /> have an agreement for response and all appropriate Federal, State and local agencies who must be <br /> contacted in case of discharge. Correct by revising the emergency contact list to include the missing <br /> information. <br /> # 27. Plan lacks description of potential equipment failure. Plan does not address potential equipment <br /> failure of diesel AST and any mobile/ portable container X55 gallons. Plan must indicate reasonable <br /> potential for equipment failure (such as un/loading equipment, tank overflow, rupture, leakage or any <br /> equipment known to be source of discharge), include in the Plan: a prediction of direction, flow rate, total <br /> quantity of oil which could be discharged from facility as result of each type of major equipment failure. <br /> Correct by including this description in the Plan. <br /> # 31. Failed to conduct inspections and tests. Plan lacks written procedures that the operator/owner or <br /> the certifying PE has developed. Written procedures and a record of inspections and test, signed by the <br /> appropriate supervisor/ inspector, with the SPCC Plan for a period of 3 years. Correct by including <br /> written procedures for inspections and testing. <br /> # 32. Failed to train personnel on discharge prevention, designate a person accountable for discharge <br /> prevention and schedule prevention discharge briefings annually. No documentation found on training <br /> employees. Train the oil-handling personnel in operations and maintenance of equipment to prevent <br /> discharge, discharge procedure protocols, applicable pollution control laws, rules and regulations, <br /> general facility operations and contents of SPCC Plan. A designated person must be a person who is <br /> accountable for discharge prevention and who reports to facility management. Correct by naming an <br /> individual as a designated person accountable for oil prevention discharge that would report to facility <br /> management. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE($122). <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Ins ector: Received By: ^� Title: <br /> EHD 23-02-003 Rev 08110/10 CONTINUATION FORM <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.