Laserfiche WebLink
1�Mall4NCf <br /> Page 1 of 8 0///r6VS1EMB <br /> Secondary Containment Testing Report Form <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of <br /> this forrrr to report results for all components tested. The completed form, written test procedures, and printouts from tests(if applicable),should <br /> be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: Jimco Truck Stop Date of Testing: 05/22/2009 <br /> Facility Address: 1022 Frontage Road Ripon, CA 95336 <br /> Facility Contact: ]arnail 7 Phone: (209) 599-2111 <br /> Date Local Agency Was Notified of Testing: 05/20/2009 <br /> Name of Local Agency Inspector(if present during testing): N/A <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: EPIC Compliance Systems <br /> Technician Conducting Test: Keith Huston <br /> Credentials: 0 CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester <br /> License Type: A License Number: 880430 <br /> Manufacturer Training <br /> Manufacturer Component(s) Date Training Expires <br /> Caldwell Caldwell Level Indicator N/A <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> Annular I@ ❑ ❑ ❑ UDC 6S-7S ® ❑ ❑ ❑ <br /> Seconds 1 0 ❑ ❑ ❑ UDC 7-8 El ❑ ❑ ❑ <br /> Secondary 2 21 ❑ ❑ I ❑ ❑ ❑ ❑ ❑ <br /> Secondary 3 ❑ ® ❑ ❑ ❑ ❑ ❑ ❑ <br /> Secondary 4 ❑ o ❑ ❑ ❑ o ❑ ❑ <br /> Sump 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Sump 2 �_ ❑ ❑ Ll El El <br /> sump 3 C] 0 ❑ ❑ ❑ ❑ ❑ ❑ <br /> Sump 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 1-2 0 ❑ ❑ ❑ ❑ ❑ ❑ Li <br /> UDC 3-4 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 5-6 ❑ ❑ ❑ 1 ❑ -2-1 ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> Filtered back into 500 gallon water trailer. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br /> Technician's Signature: Date: 05/22/2009 <br />