My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:57:11 PM
Creation date
8/24/2018 6:23:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516198
PE
2832
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0516198\COMPLIANCE INFO 2000 - 2016 .PDF
QuestysFileName
COMPLIANCE INFO 2000 - 2016
QuestysRecordDate
12/19/2017 10:45:19 PM
QuestysRecordID
3750331
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 8 <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Te7Method <br /> loped By: ❑UDC Manufacturer O Industry Standard L) Professional Engineer <br /> ❑ Other(Specify) <br /> sed: ❑ Pressure ❑Vacuum Ej Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used..1 <br /> hour LAKE Test Equipment Resolution: <br /> UDC # 7-8 UDC # 8S-9S UDC # 9S-10 UDC #10-115 <br /> UDC Manufacturer: Unknown ---- - --- <br /> UDC Material: Fiber lass _ - <br /> 42"' --- __ <br /> UDC Depth: <br /> Height from UDC Bottom to Top of 9 '/z'" <br /> Highest Piping Penetration: <br /> Height from UDC Bottom to Lowest 12" ----- <br /> Electrical Penetration: __-- <br /> Condition of UDC prior to testing: D -- _ -- -_-_ <br /> Portion of UDC Tested' - <br /> Does turbine shutdown when UDC <br /> sensor detects liquid(both product El Yes El No l] NA E3 Yes 13 No DNA ❑ Yes El No ❑ NA D Yes ❑ No Ll NA <br /> and water T <br /> Turbine shutdown response time See Comment <br /> is system programmed for fail-safe ❑Yes ❑ No 0 NA ❑ Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> shutdown?' <br /> Was fail-safe verified to be ❑ Yes ❑ No t] NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> operational?' <br /> Wait time between applying 5 minutes <br /> pressurelvacuumlwater and starting <br /> test <br /> Test Start Time: 2:50 PM <br /> Initial Reading ft)i 13 s/a" <br /> Test End Time: 3:50 PM <br /> Final Reading(RF): 13 3/4" <br /> Test Duration: 1 hour <br /> Change in Reading(RF-Ri): 0 <br /> Pass/Fail Threshold or Criteria: 0 <br /> Test Result: C7 pass_[3F ail Cl Pass © Fail ❑ Pass D Fail D Pass El Fail <br /> Was sensor removed for testing? © Yes ❑ No L3 NA ❑ Yes ❑ No ❑ NA L) Yes El No 13 NA ❑ Yes El No <br /> Ll NA <br /> Was sensor properly replaced after © Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> testin ? <br /> Comments— (include information on repairs made rior to testing, and recommended follow-u for failed tests <br /> Turbine Shut Down done during Annual Monitor Certification. <br /> UDC 85-95, 9-10, 10S-11S, 11-12 and13 have to be tested on another day. Ran out of time. <br /> ' If the entire depth of the UDC is not tested, specify how much was tested. if the answer to any of the questions indicated with an <br /> asterisk(*)is"NO" or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.