Laserfiche WebLink
23500 Kasson Road, Tracy Record ID PR0505989 <br /> 5-24-16 and 5-25-2016 PHOTO # 1 <br /> SPCC plan excerpt regarding integrity testing <br /> Spill Prevention, Control and Countermeasure Plan <br /> For Deuel Vocational Institution <br /> 3.6 Completely Buried Metallic Tanks <br /> There are no completely buried metallic tanks within the DVI facility. <br /> 3-7 Integrity. Testing <br /> In compliance xvith 40 CFR 112.8(c)(6), periodic visual inspections will be used to ensure <br /> integrityof the bulk storage tanks, without non-destructive integrity testing (such as hydrostatic <br /> or ultrasonic testing). Periodic visual inspections were selected based on the recommendations <br /> given in the Steel Tank Institute "Standard For The Inspection Of Aboveground Storage Tanks" <br /> (STI SP001. 4`' Edition, July 2006). Periodic visual inspections will be performed monthly and <br /> annually using the forms provided in Appendix D, which are taken from STI SPOOL Periodic <br /> Visual inspections shall be performed by DVI staff knowledgeable of the storage tank operations, <br /> the type of AST and its associated components, and characteristic of the fluid stored. <br /> 3.8 Liquid Level Sensors <br /> The ASTs listed on Table 2 have the following liquid level sensors: <br /> POMP M1 <br /> Automatic liquid Level Sensors: <br /> • New Water Treatment Plant — generator and external diesel ASTs <br /> New Wastewater Treatment Plant —external diesel AST <br /> f <br /> Elena Manzo, REHS Page 1 of 14 <br />