My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30131
>
2800 - Aboveground Petroleum Storage Program
>
PR0515796
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2019 9:08:45 AM
Creation date
8/24/2018 6:45:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515796
PE
2832
FACILITY_ID
FA0003922
STREET_NUMBER
30131
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
Dr
City
Tracy
Zip
95377
APN
25313011
CURRENT_STATUS
01
SITE_LOCATION
30131 S MacArthur Dr
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\30131\PR0515796\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
9/14/2016 6:40:54 PM
QuestysRecordID
3192744
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01/21/2013 00:33 9169397492 CEMEX - ENVIRO PAGE 02/08 <br /> r <br /> Standing Loss Control EVR Installation Equipment Check List <br /> Installing Products per ARB Executive Order VR.801-D <br /> Site Location :(name) Ge aeac -Km�l� ar <br /> Address: <br /> City/State: <br /> Contact/Phone:_ gti + y� 9 tT3 - /�'f <br /> Installing Contractor-.:(name) - �- <br /> 13�a�� Address: <br /> Clty/State: c�z, V, y- <br /> (V/ Contact/Phone; E / 7 Z7_._y� --78' 7z- <br /> Tank Number: Product: Capacity: <br /> Tank Number: Product: Capacity: <br /> Tank Number: Product: Cap ity: <br /> Installing Technician: (name): <br /> Technician Certification Nuber. <br /> Signature: <br /> Yes/No Initials 1. Is all of the installed equipment for Standing Loss Control <br /> y EVR listed in ARB Executive Order (E.O.)VR-301-D? <br /> Note: All Standing Loss Control Vapor Recovery installed <br /> equipment must be listed in E.0, VR-301-D. See <br /> attached Exhibit 1 Checklist, and !check each item <br /> installed. <br /> Yes/No Initials 2. Pressure Vacuum Vent Valve <br /> Is there a PN Vent valve installed on the top of each <br /> (gasoline) vent pipe (a maximum of three EVR PN valves <br /> per GDF) or manifold? <br /> a. PN vent valve(s)torqued to rJ0 ft. lbs. <br /> YeslNo Initials 3. White Paint <br /> y�5/ <br /> V Has the aboveground storage tank surface been prepared according to the white paint manufacturer's specifications? <br /> a. Describe surface preparation: I r � <br /> Installation, Operation and Maintenance Manual, Executive Order VR-305-0 <br /> Standing Loss Control Vapor Recovery System for Existing Installations of AST <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.