Laserfiche WebLink
01/21/2013 00:33 9169397492 CEMEX - ENVIRO PAGE 03/08 <br /> Yes/No Initials 4 White Paint <br /> Has a certified white paint been applied to the surface of <br /> CY the aboveground storage tank according to the <br /> manufacturer's specifications? <br /> a. Describe the application technique: <br /> Yes/No Initials 5. SuperVault MH Series <br /> Has the SuperVault AST been installed with the proper <br /> l pressure/vacuum vent valve? <br /> a. Describe any issues: <br /> Yes/No Initials 6, Steel Tank Institute Fireguard Protected AST <br /> Has the Fireguard AST been installed with the proper <br /> pressure/vacuum vent valve? <br /> a. Describe any issues: <br /> Yes/No Initials 7. ConVaulto AST <br /> Has the ConVaults AST been installed with the proper <br /> pressure/vacuum vent valve? <br /> a. Describe any issues: <br /> Yes/No Initials 8. Containment Solutions, Inc Hoover Vault Tank <br /> Has the Hoover Vault Tank been installed with the proper <br /> pressure/vacuum vent valve? <br /> a. Describe any issues: <br /> Yes/No Initials 9. Jensen Precast—Armor Cast, <br /> Has the Jensen Precast Armor Cast Tank been installed <br /> with the proper pressure/vacuum vent valve? <br /> a. Describe any issues: <br /> Installation,Operation and Maintenance Manual, Executive Order VR-301-D <br /> Standing Loss Control vapor Recovery System Por Existing Installations of AST <br /> Page 7 <br />