Laserfiche WebLink
AUG-07-2000 MON 08:45 AM FX,1AR0ADIA FAX NO. 62629496 P. 08 i f <br /> • i , <br /> (x) Visible oil/diesel leak corrections from lank scams and gaskets. <br /> Visible Ieaks are reported directly to the terminal manager. He in turn has the maintenance <br /> personnel repair immediately. Measures will be taken to minimize and mit.igale the leak while <br /> awaiting the repair. Any spill oil/diesel is cleaned up immediately by operation/maintenance <br /> personnel. Spill control stations are located on the fuel island and in the maintenance ficility.' <br /> (xi) A 150 gallon lank(#2)of new oil is located inside the maintenance facility. It has a bcnnod area <br /> around it. The 500 gallon lank(43)is located outside. It has curbing around it. Tank(41), <br /> diesel is outside and the property is graded to drain south toward the catch pond if necessary. All <br /> AGT's are double walled and have containment of 110%. t <br /> C. Facility Transfer Operations It 12.7(e)(3)(i-v)(: <br /> (i) Buried piping inslallation protection and examination. <br /> Not applicable. All tanks are AGT's,no piping underground. <br /> (ii) Not in service and standby service teraiinal connections: <br /> i <br /> We do not have multiple flow piping. If we have a lank out of service,it will be tagged and locked tt` <br /> out so it cannot be activated. <br /> (iii) Pipe support design: <br /> i <br /> Pipe support are constructed of steel. The run from the AG'1'to tine dispenser is very short duel b; t <br /> well protected_ <br /> i , <br /> (iv) Aboveground valve pipeline examination <br /> All valves,pipelines and pipe supports are observed at the beginning of etch shift and throughout t` <br /> the day by operations personnel. Aboveground pipelines (piping)and valves are also examiniad 9. <br /> during the weekly inspection discussed in Section E. These inspections are docwncnted I': <br /> (appendix 2). In addition, pressure testing is conducted on all aboveground pipelines on the <br /> Facility once every two years,or more frequently,if conditions wamnt. <br /> (v) Aboveground piping protection from vehicular traffic: <br /> Only lank#I has above ground piping and it is on a rased area away from vehicular traffic well <br /> protected by supports. <br /> D. Facility Tank Car and Truck Looding/Unloading Operations 1112,7(e)(4)(i-iv)I <br /> Not applicable-Food Express does no oil/fuel loading an our preuilsc. The oil/Riel is for use for our <br /> equipment use only. <br /> (i) Not applicable, u <br /> (ii) Not applicable <br /> (iii) Not applicable <br /> (iv) Not applicable 5 <br /> 1: <br />