Laserfiche WebLink
Page 1 4 <br />Program Manager is the designated person <br />accountable for spill prevention and that the <br />SPCC will be amended accordingly. <br />(8) Item 53 - Failed to locate portable containers to <br />prevent Discharge or provide sufficient <br />secondary containment capacity that will hold <br />the volume of the largest container plus <br />sufficient free board to contain precipitation. <br />Corrective Action: There are roughly 3,500 55 <br />gallon drums of Fog Oil stored in Area C at the <br />DDJC Tracy Facility. 40 CFR 112-8(C)(11)allows <br />for the use of catchment basins as a means of <br />secondary containment. In the event that all <br />the Fog Oil drums were to rupture at one time, <br />our Storm Water Retention Pond has a capacity in <br />excess of 24.5 million gallons not counting <br />freeboard and would easily contain the total <br />Area C spill with sufficient additional storage <br />capacity for precipitation. Nothing may leave <br />this catchment basin without being pumped and <br />the pumps may not be operated without the <br />consent of the DESJC Environmental Office and a <br />water sample being collected. <br />