Laserfiche WebLink
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: CHEVRON 307709 Date of Testing: 3/20/2018 <br />Facility Address: 10858 TRINITY PKWY, STOCKTON, CA 95219 <br />Facility Contact: MANAGER (N-7462-1-10) Phone: 209-952-2213 <br />Date Local Agency Was Notified of Testing: 2/27/2018 <br />Name of Local Agency Inspector (if present during testing): unknown <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: TANKNOLOGY INC. <br />Technician Conducting Test: Jarrod Coukc <br />Credentials): r CSLB Contractor W ICC Service Tech. r SWRCB Tank Tester r Other (Specify) <br />License Number(s): 8155550 <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used By: 7 Hydrostatic W Vacuum r Other <br />Test Equipment Used: VACUUM TEST Equipment Resolution: 0.1 gph <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc.) <br />Spill Box # Tank T 1 <br />UNLEADED - Fill 1 - Direct <br />- Grade level in <br />containment sump <br />Spill Box # Tank T-2 <br />PREMIUM - Fill 1 - Direct - <br />Grade level in containment <br />sump <br />Spill Box # Tank T-3 Diesel <br />- Fill 1 - Direct - Grade level <br />in containment sump <br />Spill Box # <br />Bucket Installation Type: <br />f Direct Bury <br />r: Contained in Sump <br />r Direct Bury <br />r Contained in Sump <br />r Direct Bury <br />r Contained in Sump <br />r Direct Bury <br />f Contained in Sump <br />Bucket Diameter: <br />12.00 <br />12.00 <br />12.00 <br />Bucket Depth: <br />12.50 <br />12.50 <br />12.50 <br />Wait time between applying <br />vacuum/water and start of test <br />5 min <br />5 min <br />5 min <br />min <br />Test Start Time (Tl): <br />09:06:00 <br />09:08:00 <br />09:12:00 <br />Initial Reading (Rl): <br />30.00 <br />30.00 in. H2O <br />30.00 in. H2O <br />Test End Time(TF): <br />09:07:00 <br />09:09:00 <br />09:13:00 <br />Final Reading (RF): <br />27.00 <br />30.00 in. H2O <br />26.00 in. H2O <br />Test Duration(TF—Tl): <br />1 min <br />1 min <br />I min <br />Change in Reading (RF—Rl) : <br />-3.00 <br />0.00 in. H2O <br />-4.00 in. H2O <br />Pass/Fail Threshold or Criteria: <br />+/-4.00 <br />+/-4.00 <br />+/-4.00 <br />+/- <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Coin MCI] ts -(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: C/v <br />Date: 3/20/2018 <br />'State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements may be more stringent. <br />WO: 2334431 <br />