My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 9:26:53 AM
Creation date
9/4/2018 1:38:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Monitoring Certification Checklist <br />Store Number: 307709 <br />Address: 10858 TRINITY PKWY STOCKTON, CA 95219 <br />Date: 3/20/2018 <br />Technician: Jarrod Cooke <br />Company: TANKNOLOGY INC. <br />Step <br />Instruction <br />Tl <br />T-2 <br />T-3 <br />Yes <br />(especially tank manifolding setup - see Note 2) <br />Product <br />UNLEADED <br />PREMIUM <br />Diesel <br />Yes <br />Make a note if sensor label missing or illegible, & approx. cord length for -208/-209 with missing labels <br />Tank Type <br />Fiberglass <br />Fiberglass <br />fiberglass <br />(DW FRP, DWSteel, SW FRP) <br />1 <br />Annular Riser Height (measured) <br />2 <br />Tank Diameter: (from tank chart <br />118.00 in. <br />118.00 in. <br />119.50 in. <br />for example: 118.375",117.75 ,111 ",92 ",etc.) <br />3 <br />For FRP tanks, 1/2 circumference of the tank <br />185.26 in. <br />185.26 in. <br />187.62 in. <br />(0.5 X 3.14X tank diam.) OR (q.57 x step 2) <br />Required annular sensor length: <br />4 <br />FRP = Riser + 112 Circumference = step I + step 3 <br />185.26 in. <br />185.26 in. <br />187.62 in. <br />Steel = Riser + diameter = step I +step 2 <br />Mark & label the required sensor length on <br />5 <br />sensor cord. Label should be under the cap & <br />serve to prevent the cord being pulled too short. <br />Is tank annular sensor in the correct position? <br />6 <br />FRPTanks: with the marked required length <br />lining up with the top of the annular riser? <br />Steel Tanks: sensor touching bottom with slack <br />above the marked required sensor length? <br />Are the DW pipe boots pulled back in tank sumps? <br />8 <br />(YIN or N/A, note if can't be verified because <br />N/A <br />N/A <br />N/A <br />clamshell pointing down) <br />Are tank sump sensors back in their holders and <br />9 <br />in the correct position? <br />Yes <br />Yes <br />Yes <br />(YIN or N/A document with photo) <br />Approximate gallons of product dispensed for <br />7 <br />purging, etc. and returned to tank <br />150.00 gal <br />Has the Veeder Root Battery been replaced & dated prior to failsafe? <br />Replaced Today <br />(lf battery backup failed, label and leave failed battery on top of console, note in comments and advise your OM) <br />Has Veeder Root Programming before & after testing been printed & verified? <br />Yes <br />(especially tank manifolding setup - see Note 2) <br />Has Veeder Root Programming before & after been attached to the Work Order? <br />Yes <br />Have all sensor model numbers been verified against the Veeder Root cord label? <br />Yes <br />Make a note if sensor label missing or illegible, & approx. cord length for -208/-209 with missing labels <br />Additional Comments: <br />Note 1: Certain Veeder Root Software versions will automatically revert to the default tank manifold settings anytime the programming is changed, such as when sensors are <br />temporarily X'ed out, etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.