Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1.FACILITY INFORMATION <br /> Facility Name:CHEVRON 307709 Date of Testing:3/24/2017 <br /> Facility Address: 10858 TRINITY PKWY,STOCKTON,CA 95219 <br /> Facility Contact:MANAGER(N-7462-1-10) Phone:209-952-2213 <br /> Date Local Agency Was Notified of Testing: <br /> Name of Local Agency Inspector(if present during testing):ceaser r <br /> 2.TESTING CONTRACTOR INFORMATION <br /> Company Name:TANKNOLOGY INC. <br /> Technician Conducting Test:Steve Willems <br /> Credentials): r CSLB Contractor r ICC Service Tech. r SWRCB Tank Tester r Other(Specify) <br /> License Number(s):A <br /> 3.SPILL BUCKET TESTING INFORMATION <br /> Test Method Used By: r Hydrostatic r vacuum r Other <br /> Test Equipment Used:LAKE TEST I Equipment Resolution:0.0625 in. <br /> Spill Box#Tank T I Spill Box#Tank T-2 Spill Box#Tank T-2 Spill Box#Tank T-3 Diesel <br /> Identify Spill Bucket(By Tank UNLEADED-Fill 1-Direct PREMIUM-Fill 1-Direct- PREMIUM-Fill 1-Direct- <br /> Number, Stored Product, etc.) -Grade level in Grade level in containment Grade level in containment 'Fill 1-Direct-Grade level <br /> containment sump sump sump in containment sump <br /> Direct Bury �' Direct Bury r- Direct Bury T Direct Bury <br /> Bucket Installation Type: t: Contained in Sump r Contained in Sump 0; Contained in Sump r Contained in Sump <br /> Bucket Diameter: 12.00 12.00 12.00 12.00 <br /> Bucket Depth: 12.50 12.50 12.50 12.50 <br /> Wait time between applying <br /> 5 min 5 min 1 min 5 min <br /> vacuum/water and start of test <br /> Test Start Time(TI): 13:02:00 13:02:00 15:26:00 13:02:00 <br /> Initial Reading(Rl): 12.25 in.H2O 12.00 in.H2O 30.00 in.HG 12.25 in.H2O <br /> Test End Time(TF): 14:02:00 13:47:00 15:27:00 14:02:00 <br /> Final Reading(RF): 12.25 in.H2O 11.50 in.H2O 30.00 in.HG 12.25 in.H2O <br /> Test Duration(TF-TI): 1 hr 45 min 1 min 1 hr <br /> Change in Reading(RF-RI): 0.00 in.H2O -0.50 in.H2O 0.00 in.HG 0.00 in.H2O <br /> Pass/Fail Threshold or Criteria: +/-0.00 +/-0.00 +/-4.00 +/-0.00 <br /> Test Result: Pass Fail Pass Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> replaced the drain and shut off ring on the 91 fill,spill buckets pass tightness but not capacity. <br /> CERTIFICATION OF TECE MCIAN RESPONSIBLE FOR CONDUCTING TIRS TESTING <br /> /hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: I' qs— Date: 3/24/2017 <br /> State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements may be more stringent. <br /> WO:2330296 <br />