My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012 - 2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2012 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 1:17:35 PM
Creation date
9/5/2018 2:09:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2012 - 2013
FileName_PostFix
2012 - 2013
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� NTc - V - ST <br />P` APR _2 4 2013 SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.orct/ghd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT <br />3b7707 <br />Facility <br />Facility 0855 �"Innit " <br />I"apecuon A 24. <br />r <br />Name. .$)i . > .:. <br />Address <br />Date. ,2.013 <br />Rosie Biggs lity <br />Title: Manager <br />Phone: 952-221 <br />Con= <br />Inspeiron <br />Type: A Routine g.,Monitodng System Certificationy Installation , Complaint - ID& Other. <br />T <br />Type: <br />(Authortty HSC 25289) <br />Consent for i:; lnspeclion ':Sampling APhotos Granted by r l i S Title: lVanager <br />ne. £ <br />Panel. ^deser-Oct TL.S"35� <br />System: Pressurized Suction Gravity <br />Ove rfil <br />Prevention: C; Mechanical MAudlbkNisual <br />UST <br />Product <br />fro. cnr <br />G' r3Wi. <br />-------------- <br />Designated rrd Dah'r n ICC Exp. -28-14 <br />Operator Date <br />Violations M1 -Release Detection M2 -Release Prevention "' M3 - Both <br />man`�- <br />On Site SfMce ICC rCi`0 ' <br />D eFxD <br />Technician: Training: <br />VIOLATIONS <br />C7 C2 <br />HSC = California Health and Safety Coda' CCR = CWUomia Code of Regulations <br />M Code Section <br />Cl =Gass 1 mulahm C2 - Clow 2 vidadion: M - Minor violation <br />He Review <br />101 HSC 25284 No permit to operate <br />102 HSC 25404.5 Annual operating fees not paid <br />_ <br />103 HSC 25264(a)(3) No written agreement between the person that the operating permit was issued to and the tank operator to <br />monitor the tank item <br />1D4 HSC 25292.2 Current financial responsibility documents not on file with the Environmental Health Department <br />105 CCR 2711 Current Unified Program Consolidated Forms not on file with the EHD (Facility and tank form) y <br />106 CCR 2632(b) Monitoring Program (Monitoring & Response Plans) is not current or approved by the EHD <br />107 CCR 2632(d)(1)(C) Plot plan/slte map not submitted or fails to completely show where monitoring Is performed <br />108 CCR 2637 Secondary containment (a) test not performed: (e) test report not submitted within 30 days; (f) lest notification <br />not rovided to the EHD at least 48 hours prior to conducting the test <br />Monitoring equipment oeftificatlon: (a) not performed annually; (d) test report not submitted within 30 days; <br />109 CCR 2638 (e) test notification not provided to the EHD at least 48 hours prior to conducting an installation, repair <br />replaoement, calibration, or certification <br />110 HSC -2752-91 (f) Annual line leak detector test not performed (MI) <br />111 HSC 25284.2 Annual spill containment testing not performed <br />112 CCR 2636(f)(4) Annual line tightness test not performed if positive shutdown or fail safe not present (M1) <br />... <br />113 CCR 2715(x) Failed to Inform the EHD of a change of designated operator within 30 days <br />114 CCR 2715(b) Designated operator does not possess a current ICC CA UST System Operator certification <br />Repair for tank or piping not tested for tightness after completion of the repair pursuant to (M2) <br />115 CCR 2660(k) <br />permit conditions <br />116 HSC 25292.5 Enhanced leak detection (ED) testing not performed on a system located within 1000' of public well, or <br />failures not repaired and retested <br />117 CCR 2661 Permit to repair UST system not obtained <br />118 HSC 25286(a) Operational permit not amended when UST storage and/or monitoring system changed <br />_ <br />119 HSC 25298(b) Permit to temporarily dose UST system not obtained <br />120 HSC 25298(c) Permit to dose UST system not obtained <br />On Site Records <br />_ <br />Maintenance & monitoring records not maintained 3 years, cathodic protection records for 6 54 years, written <br />performance daims pertaining to release detection systems for 5 years, or records of repairs, linings, and <br />201 <br />i <br />CCR 2712(b) <br />upgrades for the life of the tank. Monitoring records include: (1) date and time of all monitoring or sampling; <br />(2) monitoring equipment calibration and maintenance records; (3) results of any visual observations; (4) <br />results of sample analysis performed a lab or in the field; (5) logs of all readings of gauges or other monitoring <br />equipment, ground water elevations, or other test results 6 results of inventory readings and reconaliabons 1 <br />202 <br />CCR 2712(1) <br />Monitoring plan, response plan, and/or operating permit and all conditions not onsite <br />203 <br />? <br />—.._............ <br />CCR 2650 <br />Unauthorized a containment n cleaned u within eight hours M1 <br />p 9 <br />f <br />was not recorded; a seconds containment, not cleaned u after ei M hours, ora sudden lass of <br />aftereight <br />O Ped ry Io ry <br />iEhiDtwlthin <br />odud waotleaserted to the 24 hours -- -- th .....---_'.. <br />Garrett Backus (2) 468-2& <br />EHD 23-02 Rev 04/19/12 Paps 1 3 -UST INSPECTION REPORT <br />c <br />
The URL can be used to link to this page
Your browser does not support the video tag.