Laserfiche WebLink
-11 - <br />Port Assembly to bleed off all pressure from the bladder. <br />7.5 Close the ball valve marked "C", if not already done. <br />7.6 Remove the Test Port Assembly from location "E" and install the 1" pipe plug. <br />Use a pipe sealant approved for use with gasoline on the threads and tighten to <br />60 ft -lbs. <br />7.7 Install the 1" pipe plug to location "F". Use a pipe sealant approved for use with <br />gasoline on the threads and tighten to 60 ft -lbs. <br />7.8 Open the ball valve marked "A". Lock all ball valves using the padlocks. <br />7.9 The Clean Air Separator should now be in normal operation configuration. Verify <br />this by using the outline from Section 6.7 and Figure 1. <br />8 REPORTING <br />8.1 Record test data on the form shown in Figure 3. Districts may require the use of an <br />alternate form, provided that the alternate form includes the same minimum <br />parameters as identified in Figure 3. <br />Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 4 — VR -202-A <br />