My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2019 2:28:59 PM
Creation date
9/7/2018 2:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL_2006
FileName_PostFix
2006
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-12 - <br />Figure 3 <br />Data Form for Determination of Static Pressure Performance <br />of the Healy Clean Air Separator <br />SOURCE INFORMATION <br />GDF Name and address <br />GDF Representative and title <br />GDF Phone No. <br />Date and Time of Last Fuel Drop to GDF: <br />P/O #: <br />A/C#: <br />District Test Witness: <br />Date of Last Calibration of Pressure <br />Measurement Device: <br />VACUUM TEST (Section 7.1 through 7.2.7) <br />Vacuum at start of test, inches water column (7.2.3) <br />Vacuum at one minute, inches water column <br />Vacuum at two minutes, inches water column <br />Vacuum at three minutes, inches water column <br />Vacuum at four minutes, inches water column <br />Final vacuum at five minutes, inches water column <br />Allowable minimum vacuum, inches water column (from Table 1) <br />POSITIVE PRESSURE TEST (Section 7.3 through 7.3.9) <br />Pressure at start of test, inches water column (7.3.6) <br />Pressure at one minute, inches water column <br />Pressure at two minutes, inches water column <br />Pressure at three minutes, inches water column <br />Pressure at four minutes, inches water column <br />Final pressure at five minutes, inches water column <br />Allowable final pressure, inches water column (7.3.9) 1.77 <br />Test conducted by <br />Test company <br />Date of test <br />Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 4 — VR -202-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.