Laserfiche WebLink
SWRCB, January 2002 <br />5. SF.CONDARV PIPE TFCTINC <br />Page of <br />'Fest Method Developed By: X Piping Manufacturer Industry Standard i ; Professional Engineer <br />I Other (Sped) <br />Test Method Used: X Pressure ❑ Vacuum Ilydrostatic <br />I Other (Spec) <br />Test Equipment Used: Pressure Gauge Equipment Resolution: 0-15 PSI <br />Piping Run # 1 <br />Piping Run # <br />Piping Run 8 <br />Piping Run # <br />Piping Material: <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Piping Diameter: <br />3" <br />Length of Piping Run: <br />15' <br />Product Stored: <br />Diesel <br />Method and location of <br />--piping-run isolation: <br />Test boot <br />Test boot <br />Test boot <br />Test boot <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 min <br />5 min <br />5 min <br />5 min <br />Test Start Time: <br />8:50 <br />Initial Reading (111): <br />5 PSI <br />Test End Time: <br />9:50 <br />Final Reading (RF): <br />5 PSI <br />Test Duration: <br />I Hour <br />1 Hour <br />1 Hour <br />I Flour <br />Change in Reading (RF-Ri): <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 drop <br />0 drop <br />0 drop <br />0 drop <br />Test Result: <br />x Pass 11 Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />_ <br />t I Pass ❑ Fail <br />Comments —(include infbrmation on repairs made prior to testing, and recommended follow-up for failed tests) <br />