Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Page of <br />Test Method Developed By: 11 Sump Manufacturer Industry Standard X Professional Engineer <br />❑ Other (Sped) <br />Test Method Used: ❑ Pressure Vacuum X Hydrostatic <br />U Other (Specify) <br />Test Equipment Used: Caldwell Systems'quipment Resolution: .005/30 min <br />Sump # I <br />Sump #Sump <br /># <br />Sump # <br />mmmmmmmEL- <br />Sump Diameter: <br />36" <br />Sump Depth: <br />17" <br />Sump Material: <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />91, <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />14" <br />Condition of sump prior to testing: <br />Dry <br />Portion of Sump Tested' <br />2" above <br />Highest piping <br />penetration <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />x Yes fl No [INA <br />❑ Yes ❑ No [INA <br />i l Yes 1 1 No ❑ NA <br />0 Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown? <br />x Yes ❑ No ❑ NA <br />❑ Yes U No (INA <br />U Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes x No 0 NA <br />❑ Yes ❑ No U NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5 min <br />5 min <br />5 min <br />5 min <br />Test Start Time: <br />9:10 <br />Initial Reading (RO: <br />.00" <br />.00" <br />.00" <br />.00" <br />Test End Time: <br />9:40 <br />Final Reading (RF): <br />.00 <br />Test Duration: <br />30 min <br />30 min <br />30 min <br />30 min <br />Change in Reading (RF -Rt): <br />.00 <br />Pass/Fail Threshold or Criteria: <br />.005/30 min <br />.005/30 min <br />.005/30 min <br />.005/30 min <br />Test Result: <br />z Pass 0 Fail <br />❑ Pass 0 Fail <br />0 Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />❑ Yes U No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No i INA <br />x Yes F' No I"1 NA <br />I l Yes U No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up.for jiiiled cesis) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to ggy of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRC13 LG -160) <br />