My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARMY
>
1624
>
2300 - Underground Storage Tank Program
>
PR0231014
>
COMPLIANCE INFO_2007 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 2:52:26 PM
Creation date
9/20/2018 9:29:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2017
RECORD_ID
PR0231014
PE
2361
FACILITY_ID
FA0003777
FACILITY_NAME
TOYS R US
STREET_NUMBER
1624
STREET_NAME
ARMY
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
16334002
CURRENT_STATUS
01
SITE_LOCATION
1624 ARMY CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />i. SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: X Piping Manufacturer n Industry Standard LI Professional Engineer <br />u Other (Specify) <br />Test Method Used: X Pressure L Vacuum I I Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: PI-CSSUre GatiLe in PsiNitrogen Equipment Resolution: 1/10 x 15 Psi <br />Piping Run # 1 <br />Piping Run # <br />Piping Run # Piping Run # <br />Piping Material: Fiberglass <br />Piping Manufacturer: Smith <br />Piping Diameter: 3" <br />Length of Piping Run: <br />Approx. 17' <br />Product Stored: <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at Piping <br />Sum <br />Wait time between applying <br />pressure and startingtest: <br />1 OMinutes <br />Test Start Time: <br />12:55 <br />Initial Reading (Ri): <br />3 Psi <br />Test End Time: <br />1:55 <br />Final Reading (RF): <br />3 Psi <br />Test Duration: <br />1 Hour <br />Change in Reading (RF-Ri): <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Detectable Loss <br />Test Result: <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Replaced Old Blue Line Test Boot on Secondary Pipe at UDC, prior to testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.