Laserfiche WebLink
SWRCB, January 2002 <br />i. SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: X Piping Manufacturer n Industry Standard LI Professional Engineer <br />u Other (Specify) <br />Test Method Used: X Pressure L Vacuum I I Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: PI-CSSUre GatiLe in PsiNitrogen Equipment Resolution: 1/10 x 15 Psi <br />Piping Run # 1 <br />Piping Run # <br />Piping Run # Piping Run # <br />Piping Material: Fiberglass <br />Piping Manufacturer: Smith <br />Piping Diameter: 3" <br />Length of Piping Run: <br />Approx. 17' <br />Product Stored: <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at Piping <br />Sum <br />Wait time between applying <br />pressure and startingtest: <br />1 OMinutes <br />Test Start Time: <br />12:55 <br />Initial Reading (Ri): <br />3 Psi <br />Test End Time: <br />1:55 <br />Final Reading (RF): <br />3 Psi <br />Test Duration: <br />1 Hour <br />Change in Reading (RF-Ri): <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Detectable Loss <br />Test Result: <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Replaced Old Blue Line Test Boot on Secondary Pipe at UDC, prior to testing. <br />