Laserfiche WebLink
SWRCB, January 2002 Page of <br />6. PIPING SUMP TESTING <br />Test Method Developed By: Li Sump Manufacturer Industry Standard X Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure I 1 Vacuum X Hydrostatic <br />Ll Other (Spec) <br />Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br />Sump # I Sump # Sump # Sump # <br />Sump Diameter: 36" <br />Sump Depth: 13 %" <br />Sump Material: Fiberglass <br />Height from Tank Top to Top of 10" <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest 12" <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Dry <br />Portion of Sump Tested' <br />Water Level 13" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />N/A Suction System <br />Turbine shutdown response time <br />N/A <br />Is system programmed for fail-safe <br />shutdown?* <br />N/A <br />Was fail-safe verified to be <br />operational?* <br />N/A <br />Wait time between applying water <br />and starting test: <br />5 Minutes <br />Test Start Time: <br />1:05 <br />Initial Reading (Rj): <br />.001 <br />Test End Time: <br />1:35 <br />Final Reading (RF): <br />.001 <br />Test Duration: <br />30 Minutes <br />Change in Reading (RF-Ri): <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Was sensor removed for testing? <br />l es <br />Was sensor properly replaced and <br />verified functional after testing? <br />Yes <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Suction System. <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to as of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />