My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARMY
>
1624
>
2300 - Underground Storage Tank Program
>
PR0231014
>
COMPLIANCE INFO_2007 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 2:52:26 PM
Creation date
9/20/2018 9:29:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2017
RECORD_ID
PR0231014
PE
2361
FACILITY_ID
FA0003777
FACILITY_NAME
TOYS R US
STREET_NUMBER
1624
STREET_NAME
ARMY
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
16334002
CURRENT_STATUS
01
SITE_LOCATION
1624 ARMY CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page of <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: UDC Manufacturer Industry Standard X Professional Engineer <br />Other (Spec) <br />Test Method Used: Pressure Vacuum X Hydrostatic <br />11 Other (Spec) <br />Test Equipment Lsed: Caldwell Level Change Indicator Equipment Resolution: .002 <br />UDC # 1 <br />UDC # UDC # <br />UDC # <br />UDC Manufacturer: <br />Western Fiberglass <br />UDC Material: <br />Fiberglass <br />UDC Depth: <br />21 ''/2" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />10 ''/z" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />13 '/2" <br />Condition of UDC prior to <br />testing: <br />Dry <br />Portion of UDC Tested' <br />Water Line 17 %2" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?' <br />N/A Suction System <br />Turbine shutdown response time <br />N/A <br />Is system programmed for fail- <br />safe shutdown?' <br />N/A <br />Was fail-safe verified to be <br />operational?* <br />N/A <br />Wait time between applying <br />water and starting test <br />5 Minutes <br />Test Start Time: <br />1:45 <br />Initial Reading (Ri): <br />.001 <br />Test End Time: <br />2:15 <br />Final Reading (RF): <br />.001 <br />Test Duration: <br />30 Minutes <br />Change in Reading (RF-Ri): <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />Test Result: <br />Pass <br />Was sensor removed for testing? <br />No <br />Was sensor properly replaced and <br />verified functional after testin-? <br />N/A <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Suction System. <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to ggy of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.