My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 10:44:17 AM
Creation date
9/24/2018 10:40:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> F. In -Tank Gauging / SIR Equipment : ® Check this box if tank gauging is used only for inventory control . <br /> ❑ Check this box if no tank gauging or SIR equipment is installed . <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring . <br /> Complete the following checklist : <br /> ® Yes ❑ No * Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ® Yes ❑ No * Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ® Yes ❑ No * Was accuracy of system product level readings tested? <br /> ® Yes ❑ No * Was accuracy of system water level readings tested? <br /> ® Yes ❑ No * Were all probes reinstalled properly? <br /> ® Yes ❑ No * Were all items on the equipment manufacturer' s maintenance checklist completed? <br /> r In Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G . Line Leak Detectors (LLD) , ❑ Check this box if LLDs are not installed . <br /> Complete the following checklist : <br /> ® Yes ❑ No * For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate : ® 3 g.p .h . ; ❑ 0 . 1 g.p . h ; ❑ 0 . 2 g . p . h. <br /> ® Yes ❑ No * Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No * Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No * For mechanical LLDs , does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No * For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No * For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ® N/A or disconnected? <br /> ❑ Yes ❑ No * For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system <br /> ® N/A malfunctions or fails a test? <br /> L❑ Yes El No * For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No * Were all items on the equipment manufacturer' s maintenance checklist completed? <br /> * In Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments : 1 . Leak Detector #1 feeds UDC #3=4 and leak detector #2 feeds UDC #1-2. <br /> UN-036 — www. unidoes. org Rev. 01 /17/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.