My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 10:44:17 AM
Creation date
9/24/2018 10:40:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 Page _2_ of .7- <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By : ❑ Tank Manufacturer N Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : 0 — 30" VACUUM GAUGES Equipment Resolution : + or — 0 . 05 psi <br /> Tank # TA Diesel Tank # Tank # Tank # <br /> Is Tank Exempt From Testing? ' ❑ Yes N No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> Tank Capacity : 20 , 000 gal . <br /> Tank Material : Fiberglass / Steel <br /> Tank Manufacturer: Trusco <br /> Product Stored : Diesel -20 <br /> 8 ) <br /> Wait time between applying <br /> pressure/vacuum/water and 10 mina 1 <br /> starting test : <br /> Test Start Time : 9 : OOam <br /> Initial Reading (Ri) : -10 " , s <br /> Test End Time : 11 : OOam 6 <br /> Final Reading (RF) : A0" <br /> Test Duration : 2 hrs . <br /> Change in Reading (RF-RI) : 0" <br /> Pass/Fail Threshold or Criteria : NO LOSS NO LOSS NO LOSS NO LOSS <br /> Test Result : N Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Was sensor removed for testing? N Yes ❑ No [:INA ❑ Yes ❑ No [:INA ❑ Yes ❑ No [:INA ❑ Yes ❑ No ❑ NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ® Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes El No El NA <br /> Comments — (include information on repairs made prior• to testing, and recommended follow -tip foi•failed tests) <br /> ' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br /> testing. { California Code of Regulations , Title 23 , Section 2637(a)(6) } <br />
The URL can be used to link to this page
Your browser does not support the video tag.