My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 10:44:17 AM
Creation date
9/24/2018 10:40:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 Page _3_ of .7- <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other (Specify) <br /> Test Method Used : ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used : 0 — 15 PSI GAUGES Equipment Resolution: + or= 0. 05 psi <br /> Piping Run # Diesel Piping Run # Diesel Piping Run # Piping Run # <br /> Product Line #1 Product Line #2 <br /> Piping Material : Polyethylene Polyethylene <br /> Piping Manufacturer : OPW Flex Works OPW Flex Works <br /> Piping Diameter: 2" 2' <br /> Length of Piping Run: Approx. 25' Approx. 50' <br /> Product Stored : Diesel 8-20 Diesel 8 -20 3 <br /> Method and location of Test Fitting @ STP Test Fitting @ STP <br /> piping-run isolation: Sump Sump <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min . 10 min . <br /> starting test: <br /> Test Start Time : 9: OOam 9 : OOam <br /> Initial Reading (Rj) : 5 . 0psi 5 . 0psi <br /> Test End Time : 10 : OOam 10 : 00am <br /> Final Reading (RF) : 5 .0psi 5 . Opsi <br /> Test Duration : 1 hr. 1 hr. <br /> Change in Reading (RF-RI) : O .Opsi O .Opsi <br /> Pass/Fail Threshold or NO LOSS NO LOSS NO LOSS NO LOSS <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.