My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 10:44:17 AM
Creation date
9/24/2018 10:40:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB , January 2002 Page 7 of _7_ <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested <br /> Test Method Developed By : ❑ Spill Bucket Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : Equipment Resolution : <br /> d w <br /> Spill Box # Spill Box # Spill Box # Spill Box # <br /> Bucket Diameter : <br /> Bucket Depth : <br /> Wait time between applying '� <br /> b <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time : / E' <br /> Initial Reading (Rj) : <br /> Test End Time : <br /> Final Reading (RF) : <br /> Test Duration : <br /> Change in Reading (RF-Rj) : <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result . ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests) <br /> SPILL BOXES TO BE TESTED WITH ANNUAL MONITORING SYSTEM CERTIFICATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.