Laserfiche WebLink
SWRCB , January 2002 Page 7 of _7_ <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested <br /> Test Method Developed By : ❑ Spill Bucket Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : Equipment Resolution : <br /> d w <br /> Spill Box # Spill Box # Spill Box # Spill Box # <br /> Bucket Diameter : <br /> Bucket Depth : <br /> Wait time between applying '� <br /> b <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time : / E' <br /> Initial Reading (Rj) : <br /> Test End Time : <br /> Final Reading (RF) : <br /> Test Duration : <br /> Change in Reading (RF-Rj) : <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result . ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments — (include information on repairs made prior to testing, and recommended follow -up for failed tests) <br /> SPILL BOXES TO BE TESTED WITH ANNUAL MONITORING SYSTEM CERTIFICATION <br />