Laserfiche WebLink
SWRCB, January 2002 <br />5_ P%VCONDARV P1 PF TFCTiNr <br />Page of <br />Test Method Developed By: :1 Piping Manufacturer x Industry Standard ❑ Professional Engineer <br />7 Other (Spec) <br />Test Method Used: x Pressure Vacuum ❑ Hydrostatic <br />Other (Spec) <br />Test Equipment Used:4"dial gauge <br />Piping Run # 1-2 Piping Run # <br />Equipment Resolution:0-15 psi <br />Piping Run # <br />Piping Run # <br />Piping Material: <br />Plastic <br />Piping Manufacturer: <br />OPW <br />Piping Diameter: <br />1 '/2 " <br />Length of Piping Run: <br />70 ft. <br />Product Stored: <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot in STP sump <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 minutes <br />Test Start Time: <br />11:45 <br />Initial Reading (Ri): <br />5.0 PSI <br />Test End Time: <br />12:45 <br />Final Reading (RF): <br />5.0 PSI <br />Test Duration: <br />1 hr <br />Change in Reading (RF-Ri): <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />0 PSI <br />Test Result: <br />X Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />