My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 10:44:17 AM
Creation date
9/24/2018 10:40:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5_ P%VCONDARV P1 PF TFCTiNr <br />Page of <br />Test Method Developed By: :1 Piping Manufacturer x Industry Standard ❑ Professional Engineer <br />7 Other (Spec) <br />Test Method Used: x Pressure Vacuum ❑ Hydrostatic <br />Other (Spec) <br />Test Equipment Used:4"dial gauge <br />Piping Run # 1-2 Piping Run # <br />Equipment Resolution:0-15 psi <br />Piping Run # <br />Piping Run # <br />Piping Material: <br />Plastic <br />Piping Manufacturer: <br />OPW <br />Piping Diameter: <br />1 '/2 " <br />Length of Piping Run: <br />70 ft. <br />Product Stored: <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot in STP sump <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 minutes <br />Test Start Time: <br />11:45 <br />Initial Reading (Ri): <br />5.0 PSI <br />Test End Time: <br />12:45 <br />Final Reading (RF): <br />5.0 PSI <br />Test Duration: <br />1 hr <br />Change in Reading (RF-Ri): <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />0 PSI <br />Test Result: <br />X Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.