Laserfiche WebLink
SWRCB, January 2002 <br />6. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Page 14 of 4— <br />I est method Developed I3y: UDC Manufacturer x Industry Standard ❑ Professional Engineer <br />Other (Spec) <br />Test Method Used: ❑ Pressure Vacuum x Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon TS -STS <br />UDC #1/2 UDC #3/4 <br />Equipment Resolution:.001" <br />UDC #2-3 Satellite <br />UDC #1 Satellite <br />UDC Manufacturer: <br />Bravo <br />Bravo <br />Bravo <br />Bravo <br />UDC Material: <br />FRP <br />FRP <br />FRP <br />Poly <br />UDC Depth: <br />30" <br />30" <br />30" <br />30" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />12" <br />12" <br />10" <br />10" <br />Height from UDC Bottom to] <br />Lowest Electrical Penetration: <br />0" <br />10" <br />0" <br />0" <br />Condition of UDC prior to <br />testing: <br />Clean <br />Clean <br />Clean <br />Clean <br />Portion of UDC Tested' <br />1 /2 <br />1/2 <br />1/2 <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?' <br />X Yes ❑ No ❑ NA <br />X Yes No -- NA <br />XYes y No NA <br />—1/2 <br />X Yes _— No --'NA <br />Turbine shutdown response time <br />3 sec <br />3 Sec. <br />3 sec. <br />3 sec. <br />Is system programmed for fail- <br />safe shutdown?* <br />X Yes ❑ No C <br />NA <br />X Yes _— No ❑ <br />NA <br />X_ Yes _ No ❑ <br />NA <br />X Yes ❑ No C <br />NA <br />Was fail-safe verified to be <br />operational?* <br />X Yes ❑ No ❑ <br />NA <br />X Yes '--No ❑ <br />NA <br />XYes ❑ No C NA <br />X Yes ❑ No NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />15 min. <br />15 Min. <br />15 Min. <br />15 Min. <br />Test Start Time: <br />12:03 <br />12:03 <br />12:03 <br />12:03 <br />Initial Reading (111): <br />7.228 <br />3.904 <br />2.619 <br />5.572 <br />Test End Time: <br />12:18 <br />12:18 <br />12:18 <br />12:18 <br />Final Reading (RF): <br />7.228 <br />3.904 <br />2.619 <br />5.573 <br />Test Duration: <br />15 Min <br />15 Min. <br />15 Min. <br />15 Min. <br />Change in Reading (RF-Ri): <br />0.00 <br />0.000 <br />0.000 <br />0.001 <br />Pass/Fail Threshold or Criteria: <br />0.002 <br />0.002 <br />0.002 <br />0.002 <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />Was sensor removed for testing? <br />X Yes ❑ No ❑ <br />NA <br />XYes 7 No —INA <br />X Yes ---No = NA <br />X Yes ❑ No r' NA <br />[�W�ais_se_nsor properly replaced andfied functional after testin ? <br />XYes ❑ No NA <br />XYes ❑ No NA <br />XYes ❑ No NA <br />XYes ❑ No - NA <br />Comments — (include information on repairs made prior to testing and recommended follow-up for jailed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to a� of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />