My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012 - 2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_2012 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 11:18:53 AM
Creation date
9/24/2018 11:22:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2012 - 2014
FileName_PostFix
2012 - 2014
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/10/2014 02:58PM 6616349233 <br />SWRCB, January 2002 <br />Test Method Developed By: <br />Test Method Used: <br />Test Equipment Used,W'dial <br />Piping Material: <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />ming -run isolation: <br />Wait time between applyini <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Ri) <br />pas ail Threshold or <br />Criteria: <br />4. SECOI <br />0 Piping Manufacturer <br />0 Other (Spec) <br />x Pressure <br />0 Other (Specify) <br />Piping Run # 3-4 <br />Plastic <br />OPW <br />17 ft. <br />DSL <br />Test Boot in STP <br />30 Min. <br />11:15 <br />5.1 PSI <br />12:15 <br />5.1 PSI <br />1 Hr. <br />0 PSI <br />0 PSI <br />KERN CONSTRUCTION <br />( PIPE TESTING <br />x Industry Standard <br />0 Vacuum <br />Piping Run # 1-2 <br />Plastic <br />OPW <br />1.5" <br />70 ft. <br />DSL <br />Test Boot in STP <br />30 min. <br />11:15 <br />5.0 PSI <br />12:15 <br />5.0 PSI <br />1 HR. <br />0 PSI <br />0 PSI <br />PAGE 02/05 <br />Page Z of <br />0 Professional Engineer <br />0 Hydrostatic <br />Equipment Resolution:0-15 psi <br />Piping Run # Piping Run # <br />Comments — (include information on repairs made prior to testing, and recommended ollow-u or ailed tests) <br />Received Time Oct.10. 2014 3:57PM No.7310. <br />
The URL can be used to link to this page
Your browser does not support the video tag.