My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
1181
>
2800 - Aboveground Petroleum Storage Program
>
PR0530292
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2019 10:32:41 AM
Creation date
9/24/2018 3:47:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0530292
PE
2833
FACILITY_ID
FA0007096
FACILITY_NAME
PG&E: McDonald Island Compressor Station
STREET_NUMBER
1181
Direction
N
STREET_NAME
ZUCKERMAN
STREET_TYPE
Rd
City
Stockton
Zip
95206
APN
129-310-12
CURRENT_STATUS
01
SITE_LOCATION
1181 N Zuckerman Rd
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c� <br /> r <br /> a � <br /> � r <br /> r , <br /> AInti+iii<��,l,c �1il tank is located inside the elevator room on the platform levet at ti <br /> the �,Vhiskev Slough Station It is recommended that procedures to inspect o <br /> this t.tnh oil `1 regular basis be written and implemented Records of C <br /> maintenance activities should be completed and maintained <br /> inspection and o <br /> i <br /> cts <br /> Remote Gas Stora a Well Sites: o <br /> 0 <br /> duction fluid tank at remote gas storage well site <br /> 1) The containment around pro <br /> Roberts #land #2 has a capacity of approximately 1,201 gallons. It is <br /> ure itsed by at <br /> recommended that <br /> tacommodate 100 pethe height of the r <br /> inment struct <br /> least 1.1 inches to cent of the capacity of the :r <br /> production fluid tank and the estimated 25-year 24-hour storm precipitation of <br /> 2.6 inches, <br /> 0 <br /> -Y 2) The containment around production fluid tank at remote gas storage well site <br /> 0 Zuckerman #3 has a capacity of approximately 376 gallons. It is <br /> Cn recommended that the height of the containment structure be increased by at <br /> least 7 3 inches <br /> ca <br /> 0 3) The containment around production fluid tank at remote gas storage well site <br /> McDonald #5 has a capacity of approximately 433 gallons. It is <br /> c6 <br /> recommended that the height of the containment structure be increased by at <br /> E least 5.1 inches, <br /> v 4) The containment around production fluid tank at remote gas storage well site <br /> McDonald #9 has a capacity of approximately 376 gallons. It is recommended <br /> N that the height of the containment structure be increased by at least 7.3 <br /> z inches. <br /> N 5) The containment around production fluid tank at remote gas storage well site <br /> N McDonald #10 has a capacity of approximately 383 gallons. It is <br /> uj recommended that the height of the containment structure be increased by at <br /> 06 least 6 9 inches <br /> C� <br /> 11 1 ne conla,nment around production fluid tank at remote gas storage well site <br /> McDonald #1 1 has a capacity of approximately 373 gallons. It is <br /> recommended that the height of the containment structure be increased by at <br /> least 7 4 inches <br /> 7) The, containment around production fluid tank at remote gas storage well site <br /> McDonald #12 has a capacity of approximately 364 gallons. Itis <br /> recommended that the height of the containment structure be increased by at <br /> least 4 inches. <br /> P,I The containment around production fluid tank at remote gas storage well site <br /> McDonald #13 has a capacity of approximately 378 gallons. It is <br /> 1-47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.