My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
1181
>
2800 - Aboveground Petroleum Storage Program
>
PR0530292
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2019 10:32:41 AM
Creation date
9/24/2018 3:47:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0530292
PE
2833
FACILITY_ID
FA0007096
FACILITY_NAME
PG&E: McDonald Island Compressor Station
STREET_NUMBER
1181
Direction
N
STREET_NAME
ZUCKERMAN
STREET_TYPE
Rd
City
Stockton
Zip
95206
APN
129-310-12
CURRENT_STATUS
01
SITE_LOCATION
1181 N Zuckerman Rd
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On June 1, 2012, ETIC Engineering, Inc., on behalf of PG&E, obtained verification <br /> measurements of the containment structures around the production fluid storage tanks C-30 at <br /> Turner Cut and Whiskey Slough Stations. The volume of the containment structures were <br /> recalculated using these newly obtained measurements. Based on these calculations, the <br /> containment structures around the production fluid storage tank (C-30) at the Turner Cut <br /> Station and Whiskey Slough Station have an estimated capacity of 29,744 and 30,704 gallons, <br /> respectively. Therefore, the containment structures around production fluid storage tank C-30 <br /> at Turner Cut and Whiskey Slough Stations are adequate to accommodate 100 percent of the <br /> capacity of production fluids tank (26,700 gallons) and an estimated 25-year 24-hour storm <br /> precipitation of approximately 2.6 inches. As such, modification of the containment structures <br /> around production fluid storage tank C-30 at Turner Cut and Whiskey Slough Stations, as <br /> recommended in the September 2010 SPCC Plan is not required. <br /> Professional Engineer Certification <br /> This addendum to the September 2010 SPCC plan for the McDonald Island <br /> Underground Natural Storage Facility was prepared based on information provided by <br /> PG&E and ETIC Engineering, Inc.'s inspection of the production fluid storage tank at <br /> Turner Cut and Whiskey Slough Stations on June 1, 2012. <br /> Karthika Thurairajah, PE (ETIC Engineering, Inc.) <br /> Printed Name of Registered Professional Engineer <br /> � � iQlla <br /> Signature of Registered Professional Engineer Date <br /> Registration No.: C 73394 State: CA <br /> Q(LOFESs/� <br /> THLf <br /> a <br /> C73 94 m <br /> * EXP. / <br /> cin- <br /> grFOFCg1F��a <br /> Page 2 of 2 <br /> McDonald Island underground Natural Gas Storage Facility <br /> Addendum and Explanation to the September 2010 SPCC Plan June 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.