Laserfiche WebLink
CHRONOLOGY <br /> Gene Gabbard, Inc. <br /> 640 N. EI Dorado Street <br /> Stockton CA 95202 <br /> 03/26/97 One 250 gallon underground storage tank for waste oil was removed this date <br /> under Environmental Health Department (EHD) permit and inspection. Soil <br /> samples for analysis were collected from beneath the tank and from the soil <br /> stockpile. <br /> 04/30/97 The EHD received laboratory results this date and contamination was reported in <br /> all samples analyzed. <br /> 04/09/98 Date the EHD received copies of the waste manifests for tank and tank rinsate. <br /> 04/10/98 Unauthorized Release Report#98-U13 and Notification of Hazardous Waste <br /> Discharge #98-051 submitted this date. <br /> 06/02/98 Notice of Responsibility and site letter sent this date to responsible party (RP) <br /> Gene Gabbard, Inc. The letter included a directive to submit a work plan to begin <br /> the site investigation no later than 07/24/98. <br /> 09/01/98 Work Plan for Subsurface Investigation dated 08/24/98, submitted by Ground <br /> Zero Analysis, Inc. (Ground Zero)was conditionally approved by the EHD on this <br /> date. <br /> 11/02/98 Date of letter from the State Water Resources Control Board Cleanup Fund <br /> (CUF) stating the site had been placed on the Priority List in Priority Class 'B'. <br /> 01/11/99 Date EHD received a copy of the Letter of Commitment from the CUF. <br /> 01/19/99 Site investigation began this date with Geoprobe soil borings, see Subsurface <br /> Investigation Summary Report dated 05/20/99, submitted by Ground Zero. <br /> 06/21/99 Date of EHD correspondence directing submittal of a work plan to continue the <br /> site investigation. The Work Plan was due no later than 08/20/99. <br /> 08/26/99 Date of EHD correspondence conditionally approving Work Plan Addendum for <br /> Subsurface Investigation dated 08/19/99, submitted by Ground Zero. <br /> 09/14/99 Date of CUF letter preapproving corrective action costs. <br /> 10/26/99 On this date the site investigation continued with additional Geoprobe soil <br /> borings, see Additional Subsurface Investigation Summary Report dated <br /> 04/04/00, submitted by Ground Zero. The report recommended the installation of <br /> groundwater monitoring wells. <br /> 04/17/00 Date of EHD correspondence directing submittal of a Work Plan to continue the <br /> site investigation, due no later than 06/02/00. <br />