r • <br /> Chronology Page 2 <br /> 640 N. EI Dorado Street, Stockton <br /> 05/17/00 Notice of Responsibility and site letter sent this date to new property owners, Jim <br /> & Sheyla Creel. <br /> 08/31/00 Date of EHD correspondence approving Work Plan for the Installation of <br /> Groundwater Monitoring Wells, dated 08/15/00, submitted by Ground Zero. <br /> 10/25/00 Date of CUF letter preapproving corrective action costs. <br /> 12/13-14/00 Site investigation continued with the installation of four groundwater monitoring <br /> wells during these dates. The wells were sampled on 12/20/00; See <br /> Groundwater Monitoring Well Installation Report dated 04/12/01 submitted by <br /> Ground Zero. <br /> 06/11/01 Date of EHD correspondence; review of groundwater monitoring well installation <br /> report and directive to begin and continue routine quarterly groundwater <br /> monitoring and sampling until directed otherwise by the EHD. <br /> 06/27/01 Date of CUF letter preapproving corrective costs. <br /> 06/28/01 Monitoring and sampling event this date; free product motor oil was discovered in <br /> MW-3. Technician began procedure of bailing free product. <br /> 10/30/01 Date of CUF letter preapproving corrective costs. <br /> 12/31/01 Date of the EHD correspondence directing submittal of a work plan to continue <br /> the investigation of the vertical and lateral extent of the contamination, and to <br /> begin feasibility testing. The deadline for the work plan submittal was 2/25/02. <br /> 03/08/02 On behalf of the Responsible Party, Ground Zero verbally requested an <br /> extension until 03/31/02 for submittal of the work plan. <br /> 04/04/02 Work Plan for Additional Groundwater Monitoring Well Installation prepared by <br /> Ground Zero was submitted to the EHD this date. <br /> 04/16/02 Date the EHD conditionally approved the Work Plan, but directed submittal of an <br /> addendum to address the issue of vertical delineation. Deadline for submittal of <br /> the addendum was 05/13/02. <br /> 05/24/02 Date of Revised Work Plan for Additional Groundwater Monitoring Well <br /> Installation, two weeks late; it still did not address vertical delineation. <br /> 06/11/02 EHD correspondence sent this date denying 05/24/02 work plan because it did <br /> not address vertical delineation, and it also changed the number of proposed <br /> additional groundwater monitoring wells from three to two; new deadline for <br /> submittal of an adequate work plan was 07/08/02. Proposal to conduct a <br /> pumping test on MW-3 was approved. <br /> 09/06/02 Date of Work Plan for installation of additional wells -two months late. <br />