Laserfiche WebLink
UST SYSTEM PRINTSET INFORMATION • <br /> 1. Four complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. _!2,'— Plot plan to show location and number of tanks. <br /> 4. Tank cross-sectional diagram included on prints submitted. <br /> 5. Y. Detail of tank, piping system, excavation and cover. <br /> 6. ly Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br /> Article 3, Sec. 2631 (r) 8 26351 <br /> 7. —14— Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)3 <br /> 8. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)] <br /> 9. 4— Tightness Test (NFPA 30) is required on both primary (to) and secondary (20) containment systems before covering. <br /> TTT [Section 2635 (b) (6) 8 (7)] <br /> q i <br /> 10. J1rJ!� risle ua'll ed tanks using pressure or vacuum testing to nanitor the annular space. [Section 2635 (b) (7)7 <br /> 11. ti <br /> IfCr 6A SZ9 "Precision Test" required upon completion of installation with tank in operating condition. Test results to <br /> be submitted directly to PHS/EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (g)] <br /> 12. TANK COMPOSITION <br /> TANK # # # # # # <br /> CAPACITY ltJ vOD I D�� <br /> MANUFACTURER <br /> COMPOSITION <br /> — <br /> MODEL / '— <br /> PRODUCT 4_ m t44 c7 <br /> CORROSION PROTECTION f <br /> U.L. LISTED t� <br /> COMPATIBILITY WITH 100% <br /> METHANOL <br /> 13. ATO <br /> s) TO BE INSTALLED <br /> N A. Steel-cLad with fiberglass reinforced plastic. <br /> B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). [Section 2635 (b) (4)] <br /> C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br /> (1) Striker plate dimensions and materials. <br /> (2) Striker plate under all accessible openings. <br /> (3) Installation instructions require an air test and soap bubble test prior to installation. <br /> "D. Non-c LPd,steel tank [Section 2635 (b)] <br /> _ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> (2) Approved by a corrosion engineer or N.A.C.E. technician. <br /> f <br /> (3) Document stating inspection method and frequency (minimum semi-arnuaL inspection requirement). <br /> 4 <br />