My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2200 - Hazardous Waste Program
>
PR0519155
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 1:24:16 PM
Creation date
9/27/2018 2:16:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0519155
PE
2228
FACILITY_ID
FA0014325
FACILITY_NAME
PRIME SHINE CAR WASH
STREET_NUMBER
301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
045-140-010-000
CURRENT_STATUS
02
SITE_LOCATION
301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oil discharge predictions <br /> The total capacity of bulk storage at the lube including ATF, gear oil, and used oil, is 2,420 gallons. In the <br /> event of a catastrophic discharge,that would be the most at any time leaving the bulk tanks. <br /> Appropriate secondary containment or diversionary structures <br /> If a bulk tank or bulk tanks were compromised,they each are double-lined to retain the fluid inside. In <br /> the case that both the inner and outer walls ruptured,the containment area would become the lower <br /> bay lined with concrete. Floor drains could be plugged with oil socks to fully contain the discharge. <br /> Facility drainage <br /> The facility has no drains leading to city sewer systems near the upper bay floor.The city drains are in <br /> the common driveway area between the wash and the lube. Lower bay has two drains that run along <br /> the north and south concrete wall which could be plugged in the event of a discharge. <br /> Site security <br /> The lube is armed with 24-hour surveillance along with 3 cameras placed throughout the upper bay <br /> area. <br /> Facility inspections <br /> Inspections are done by senior and site management regularly through the year.Additionally, safety <br /> inspections are done quarterly by senior management. Once each year, an outside safety consultant <br /> inspects all facilities including the lube. <br /> Requirements for bulk storage inspections <br /> Lube supervisors perform weekly tank inspections and note their findings on the chart stored on the <br /> used oil tank. Overfill is prevented by tank alarms. <br /> Transfer procedures and equipment(including piping) <br /> Drain pans are located in each bay and are drained throughout the day as needed.The drain pans are <br /> evacuated into our used oil tank using a pump and tubing that run along the lower bay ceiling. <br /> Requirements for qualified oil-filled operational equipment <br /> All lube equipment that contains oil is maintained by the vendor or our maintenance department.The <br /> equipment is to be marked and dated if taken offline for repair. <br /> Loading/unloading rack requirements and procedures for tank trucks <br />
The URL can be used to link to this page
Your browser does not support the video tag.