My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 1:14:53 PM
Creation date
9/27/2018 4:48:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California95205-6232 <br /> Telephone: (209) 468-3420 Fax: (209) 468-3433 Web:vw W.sigov.orq/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Narne: Facility Address: Date: <br /> BET STOCKTON TERMINAL ilNGTON ST. STOCKTON Mary 07. 2016 <br /> General Requirements for SPCC Plans <br /> 613 CFR 112.7(,) Failed to conduct inspections or maintain records for 3 years ■V ❑R ❑COS <br /> 614 CFR 112.7(f)(1) Failed to train personnel on discharge prevention ■V ❑R ❑COS <br /> 615 CFR 112.7(f)(2) Failed to designate a person accountable for discharge prevention ❑V ❑R ❑COS <br /> 616 CFR 112.7(f)(3) Failed to schedule and conduct discharge prevention briefings at least annually ❑V ❑ R ❑COS <br /> 617 CFR 112.7(g) Plan failed to address security of site and valves,lock out/tag out,and lighting ❑V ❑R ❑COS <br /> 618 CFR 112.7(h)(1) Loading/unloading rack containment system not properly sized ❑V ❑R ❑COS <br /> 619 CFR 112.7(h)(2) Failed to provide vehicular departure system loading and unloading racks ❑V ❑ R ❑COS <br /> 620 CFR 112.7(h)(3) Failed to inspect lowermost drains and outlets priorto filling and departure of vehicles ❑V ❑R ❑COS <br /> 621 CFR 112.7(i) Failed to evaluate field constructed container for brittle fracture and take appropriate action ❑V ❑R ❑COS <br /> 622 CFR 112.70) Failed to include discussion of conformance to discharge prevention and containment procedures ❑V ❑ R ❑COS <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 701 CFR 112.8(b)(2) Failed to use manual open-and-closed design valves for the drainage of diked areas ❑V ❑ R ❑COS <br /> 702 CFR 112.8(b)(3), Failed to design facility drainage system from undiked areas to retain in the facility ❑V ❑ R ❑COS <br /> 11 2.8(b)(4) <br /> 703 CFR 112.8(b)(5) Failed to provide two lift pumps for more than one continuous treatment unit ❑V ❑R ❑COS <br /> 704 CFR 112.8(c)(2) Diked area is not sufficiently impervious to contain discharged oil ■V ❑R D COS <br /> 705 CFR 112.8(c)(1) Container not compatible with oil stored and/or storage conditions ❑V ❑R ❑COS <br /> 706 CFR 112.8(c)(2) Failed to provide and maintain adequate secondary containment ■V ❑R ❑COS <br /> 707 CFR 112.8(c)(3)(i) Failed to keep containment bypass valves closed when not draining rainwater ❑V ❑R ❑COS <br /> 708 CFR 112.8(c)(3)(i) Failed to inspect retained rainwater prior to discharge ❑V ❑R ❑COS <br /> 709 CFR 112.8(c)(3)(iii) Failed to open and close bypass valve to drain rainwater under responsible supervision ❑V ❑R ❑COS <br /> 710 CFR 112.8(c)(3)(iv) Failed to maintain records of drainage from diked areas ❑V ❑ R ❑COS <br /> 711 CFR 112.8(c)(5) Failed to provide corrosion protection for partially burled tanks ❑V ❑R ❑COS <br /> 712 CFR 112.8(c)(6) Failed to perform tank inspections that take into account size,configuration,and design ❑V ❑R ❑COS <br /> 713 CFR 112.8(c)(6) Failed to perform scheduled tank tests and inspections by appropriately qualified personnel ■V ❑R ❑COS <br /> 714 CFR 112.8(c)(6) Failed to test and inspect containers by appropriately qualified personnel after material repairs ❑V ❑R ❑COS <br /> 715 CFR 112.8(c)(7) Failed to provide effective leakage control through defective internal heating coils ❑V ❑R ❑COS <br /> 716 CFR 112.8(c)(8)(i-iv) Failed to provide each container with a high level monitoring device ❑V ❑ R ❑COS <br /> 717 CFR 112.8(c)(8)(v) Failed to regularly test liquid level sensing devices to ensure proper operation ❑V ❑R ❑COS <br /> 718 CFR 112.8(c)(9) Failed to observe effluent treatment frequently enough to detect potential discharge ❑V ❑R ❑COS <br /> 719 CFR 112.8(c)(10) Failed to promptly correct visible discharges and/or remove accumulations of oil in diked areas ❑V ❑ R ❑COS <br /> 720 CFR 112.8(c)(11) Failed to provide sufficient secondary containment capacity for mobile or portable containers ❑V ❑R ❑COS <br /> 721 CFR 112.8(c)(11) Failed to locate mobile or portable containersto prevent discharge ❑V ❑R ❑COS <br /> 722 CFR 112.8(d)(1) Failed to take corrective action on buried piping when exposed for any reason ❑V ❑R ❑COS <br /> Received byInspector: Phone: Date <br /> (initial): STACY RIVERA, Senior REHS _ <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.