Laserfiche WebLink
•CK>k <br /> = � Y11rNW 07. r � � HEALTH <br /> September 5, 1996 rs � � cF RVICE <br /> CaLEPA Daniel Crownover V SEP I I PM 121 44 Pete Wilson <br /> Governor <br /> State Water Apache Plastics <br /> Resources P.O. Box 5127 <br /> Control Board Stockton, CA 95205-0127 <br /> Division of Re : Claim 1696 pre-approval <br /> Clean Water <br /> Programs <br /> Dear Mr. Crownover: -- <br /> Mailing Address: - <br /> P.O. Box 944212 I received our pre-approval documentation on An t 19, 1996 for the risk-based <br /> Sacramento, CA y p pp � <br /> 94244-2120 assessment project at 2050 East Fremont Street in Stockton. The risk-based assessment <br /> 2014 r Sneer, consists of drilling a confirmation soil boring, performing a risk-based corrective action <br /> Suite 130 analysis and preparing a closure report. <br /> Sacramento, CA <br /> 95814 <br /> (916) 227-0746 1 have pre-approved Emcon' s proposed costs, and I will place these documents in your <br /> FAX (916) 227-4530 file for future reference. <br /> World Wide Web: <br /> bttovr/vC whor°b.`a. If a different scope of work or a new contract becomes necessary,gov/—cwphome/ p then you must request <br /> fundhome.htm pre-approval of costs on the new scope of work. With the following provisions, I have <br /> pre-approved Emcon's costs for $ 13,780.81 . The total amount previously eligible <br /> through reimbursement request no. 2 for your site is $249,028.87. <br /> • The actual scope of work and pre-approved costs are consistent with Emcon' s cost <br /> estimate, dated July 18 , 1996. <br /> • The corrective action work is approved and acceptable to the San Joaquin County <br /> Public Health Services (SJCPHS) and the Regional Water Quality Control Board <br /> (RWQCB). <br /> • <br /> All subcontractor invoices, copies of reports, narrative descriptions, and <br /> applicable correspondences from the SJCPHS and RWQCB are submitted to the <br /> Fund. <br /> • Costs are presented as required in the Fund' s Recommended Minimum Invoice <br /> Cost Breakdown. <br /> • The markups are consistent with the Fund' s subcontractor markup policy, dated <br /> June 1, 1994. . <br /> Sincerely, <br /> Steve Marquez <br /> Water Resources Control Engineer <br /> a` Recycled Paper Our mission is to preserve and enhance the quality of California's water resources, and <br /> ensure their proper allocation and efficient use for the benefit ofpresent and future generations. <br />