My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 2:25:50 AM
Creation date
9/28/2018 11:45:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APACHE PLASTICS, L. P. <br /> 2050 E . Fremont St. • P.O. Box 5127 • Stockton, CA 95205-0127 • 20914664356 • 8001527-2243 • FAX 2091466-1730 <br /> October 19, 1995 <br /> Mrs. Diane Hinson <br /> Public Health Services <br /> Environmental Health Division <br /> P . O . Box 0388 <br /> Stockton, CA 95201 -0388 <br /> Dear Mrs. Hinson: <br /> This letter is to just give you a status report of our remediation project. <br /> during the month of August. <br /> As we discussed, I left the vapor extraction unit shut down du g gu <br /> Since I restarted the unit in September, it has been impossible to keep running at the same <br /> flow rate as before the extended shutdown (I sometimes have had to restart <br /> the unit 4 or 5 <br /> times per day because the unit misses and stumbles when it is pulling from the wells). <br /> I consulted with VR Systems last week who' s theory is that during shutdown the natural <br /> "bugs" became more active creating a more active degrading process (possibly promoted <br /> by my injecting air into the wells periodically during the shutdown), creating more carbon <br /> dioxide at a faster rate than before shutdown. I asked VR Systems' representative if in the <br /> de <br /> past month and a half the carbon dioxide should have been depleted mostly and shouldn't <br /> the carburetor be closing now indicating that fresh oxygen is being pulled into the unit. <br /> The answer was that they have experienced times where the degrading process is going so <br /> good that the carbon dioxide is being produced faster than the vapor extraction unit can <br /> pull it out, and that the fresh air that is being pulled into the radius of influence actually <br /> causes a chain reaction type situation promoting the degrading process. This is good if it <br /> is factual. <br /> I have recently learned that I can keep the vapor extraction unit running if I create a false <br /> vacuum with the well ball valves and have been able to very slowly increase the flow rate <br /> while doing so. If you feel that it has merit, we can sample the vapor and have it analyzed <br /> for carbon dioxide and oxygen percentage to verify the VR System theory. <br />
The URL can be used to link to this page
Your browser does not support the video tag.