My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 3:20:21 AM
Creation date
9/28/2018 4:04:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apache Plasties, Inc. Page 2 of 2 <br /> 2050 Fremont Street August 18, 2014 <br /> Stockton, California 95209 <br /> • Submittal of a report of findings following the initial injection events ; report will include <br /> description and results of work performed, conclusions, applicable recommendations <br /> and maps; and <br /> ® Preparation and submittal of a draft Notice of Intent (NOI) and monitoring and reporting <br /> program (MRP) to the California Valley Regional Water Quality Control Board <br /> (CVRWQCB) to comply with the terms of the General Waste Discharge Requirements <br /> and the Monitoring & Reporting Program No. R5-2008-0149 . <br /> The EHD tentatively approves the CAP submitted by AGE, contingent upon successful <br /> completion of the following EHD requirements : <br /> • A current waste discharge permit from CRWQCB must be obtained before any fieldwork <br /> can begin . <br /> • In accordance with the correction action plan (CAP) approval process , the EHD will post <br /> a public notification of pending CAP approval at this site. The public will have 30 days to <br /> express any concerns regarding the proposed remedial method for this site. Fieldwork <br /> can begin once the 30-day public participation period is over and all public concerns <br /> have been addressed and the CAP is approved . A copy of the public notice will be <br /> mailed to you for your records . <br /> • Neither the CAP nor the Final Remediation Plan (FRP) provided cleanup goals or <br /> objectives. Acceptable cleanup goals or objectives must be submitted and approved <br /> before starting the public participation period ; the EHD recommends setting the goal <br /> as reducing dissolved contaminant concentrations sufficiently to stabilize at levels that <br /> will pass Low-Threat Closure Policy (LTCP) criteria. <br /> • All water used for the purpose of sealing a well must be potable water and not water <br /> that has been displaced from a well that is to be destroyed or from a non-potable source. <br /> With these conditions, the EHD approves the work plan as submitted . <br /> • Notify EHD of all scheduled injection events along with any fieldwork following initial well <br /> installation . <br /> If you have any questions , please contact Angelica Sandoval Marin at (209) 468-2807 or by e- <br /> mail at amarinsjcehd.corn. <br /> Sincerely, <br /> i I <br /> Angelica S . Marin , RENS Nuel C. Henderson , Jr. , PG <br /> Senior Registered Environmental Health Specialist Engineering Geologist <br /> c: Brian Millman , AGE , 837 Shaw Road , Stockton CA 95212 <br /> Cori Condon , California Regional Water Quality Control Board Central Valley Region , <br /> 11020 Sun Center Drive , Suite 200, Rancho Cordova , California 95670 <br />
The URL can be used to link to this page
Your browser does not support the video tag.