Laserfiche WebLink
Apache Plasties, Inc. Page 2 of 2 <br /> 2050 Fremont Street August 18, 2014 <br /> Stockton, California 95209 <br /> • Submittal of a report of findings following the initial injection events ; report will include <br /> description and results of work performed, conclusions, applicable recommendations <br /> and maps; and <br /> ® Preparation and submittal of a draft Notice of Intent (NOI) and monitoring and reporting <br /> program (MRP) to the California Valley Regional Water Quality Control Board <br /> (CVRWQCB) to comply with the terms of the General Waste Discharge Requirements <br /> and the Monitoring & Reporting Program No. R5-2008-0149 . <br /> The EHD tentatively approves the CAP submitted by AGE, contingent upon successful <br /> completion of the following EHD requirements : <br /> • A current waste discharge permit from CRWQCB must be obtained before any fieldwork <br /> can begin . <br /> • In accordance with the correction action plan (CAP) approval process , the EHD will post <br /> a public notification of pending CAP approval at this site. The public will have 30 days to <br /> express any concerns regarding the proposed remedial method for this site. Fieldwork <br /> can begin once the 30-day public participation period is over and all public concerns <br /> have been addressed and the CAP is approved . A copy of the public notice will be <br /> mailed to you for your records . <br /> • Neither the CAP nor the Final Remediation Plan (FRP) provided cleanup goals or <br /> objectives. Acceptable cleanup goals or objectives must be submitted and approved <br /> before starting the public participation period ; the EHD recommends setting the goal <br /> as reducing dissolved contaminant concentrations sufficiently to stabilize at levels that <br /> will pass Low-Threat Closure Policy (LTCP) criteria. <br /> • All water used for the purpose of sealing a well must be potable water and not water <br /> that has been displaced from a well that is to be destroyed or from a non-potable source. <br /> With these conditions, the EHD approves the work plan as submitted . <br /> • Notify EHD of all scheduled injection events along with any fieldwork following initial well <br /> installation . <br /> If you have any questions , please contact Angelica Sandoval Marin at (209) 468-2807 or by e- <br /> mail at amarinsjcehd.corn. <br /> Sincerely, <br /> i I <br /> Angelica S . Marin , RENS Nuel C. Henderson , Jr. , PG <br /> Senior Registered Environmental Health Specialist Engineering Geologist <br /> c: Brian Millman , AGE , 837 Shaw Road , Stockton CA 95212 <br /> Cori Condon , California Regional Water Quality Control Board Central Valley Region , <br /> 11020 Sun Center Drive , Suite 200, Rancho Cordova , California 95670 <br />