My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011203
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
ARCHIVED REPORTS XR0011203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 4:01:30 AM
Creation date
9/28/2018 4:16:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0011203
FileName_PostFix
XR0011203
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
air sparging be continued in the second quarter Sparging into the deep extraction well should be <br /> successful as long as the water level remains high <br /> ' Although a groundwater sample was obtained from the deep extraction well and relatively high <br /> concentrations of contaminants-were reported, the results should be viewed with caution because of <br /> ' the high turbidity and unusual color of the sample More samples will be needed from this well to <br /> establish reliable values for groundwater contaminants <br /> ' The second quarter groundwater monitoring event should be scheduled for late May, when the water <br /> level is likely to reach its annual high In 1995, contaminant concentrations reached a peak in the <br /> second quarter in MW-5, and are likely to do so again because of the high water table Therefore, and <br /> in accordance with the revised sampling schedule approved by PHS/EHD, all wells should be sampled <br /> in May Samples should continue to be analyzed for TPH as gasoline and BTEX, but we recommend <br /> deleting MTBE from sampling protocol because it was not detected in the February samples <br /> 1 , <br /> 1 <br /> r _ <br /> i <br /> r <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.