Laserfiche WebLink
Mr Ronald Rowe Project 22611-100 002 <br /> January 27, 1999 <br /> Page 3 <br /> • up to 8 soil samples for TPHG using USEPA Method 8015, BTEX and MTBE <br /> using USEPA Method 8020, and oxygenates using USEPA Method 8260 <br /> • 2 soil samples (1 soil sample per boring) for STLC to evaluate leaching potential <br /> of TPHG, BTEX, MTBE, and oxygenates <br /> • up to 8 HydroPunch groundwater samples for TPHG, BTEX, MTBE, and <br /> oxygenates <br /> • analysis of composite soil sample from cuttings for disposal profiling <br /> • Samples will be analyzed on a ten day turnaround <br /> Task 4 - Reporting <br /> Upon completion of field activities and after analytical results are received EMCON will <br /> prepare a report that presents the following information <br /> • methods used and assessment results <br /> • copies of boring logs and well details (if wells installed), and analytical reports <br /> • request for case closure if warranted based upon findings <br /> SCHEDULE <br /> Permit applications will be submitted once the workplan is approved Field activities will <br /> begin within two weeks of workplan approval Samples will be analyzed once 10-day <br /> turnaround and a report will be provided four weeks after completion of field activities <br /> CPIE WACHF-\PXPORTSIAPACP101 DOC-98ft 1 Emcon <br />