My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011281
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
ARCHIVED REPORTS XR0011281
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 5:27:01 AM
Creation date
9/28/2018 5:01:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0011281
FileName_PostFix
XR0011281
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr Ronald Rowe Project 22611-100 002 <br /> January 27, 1999 <br /> Page 3 <br /> • up to 8 soil samples for TPHG using USEPA Method 8015, BTEX and MTBE <br /> using USEPA Method 8020, and oxygenates using USEPA Method 8260 <br /> • 2 soil samples (1 soil sample per boring) for STLC to evaluate leaching potential <br /> of TPHG, BTEX, MTBE, and oxygenates <br /> • up to 8 HydroPunch groundwater samples for TPHG, BTEX, MTBE, and <br /> oxygenates <br /> • analysis of composite soil sample from cuttings for disposal profiling <br /> • Samples will be analyzed on a ten day turnaround <br /> Task 4 - Reporting <br /> Upon completion of field activities and after analytical results are received EMCON will <br /> prepare a report that presents the following information <br /> • methods used and assessment results <br /> • copies of boring logs and well details (if wells installed), and analytical reports <br /> • request for case closure if warranted based upon findings <br /> SCHEDULE <br /> Permit applications will be submitted once the workplan is approved Field activities will <br /> begin within two weeks of workplan approval Samples will be analyzed once 10-day <br /> turnaround and a report will be provided four weeks after completion of field activities <br /> CPIE WACHF-\PXPORTSIAPACP101 DOC-98ft 1 Emcon <br />
The URL can be used to link to this page
Your browser does not support the video tag.