My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
5749
>
2800 - Aboveground Petroleum Storage Program
>
PR0515802
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 10:26:15 AM
Creation date
10/2/2018 10:02:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515802
PE
2832
FACILITY_ID
FA0021241
FACILITY_NAME
TRACY MUNICIPAL AIRPORT
STREET_NUMBER
5749
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5749 S TRACY BLVD
P_DISTRICT
005
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd <br /> CONTINUATION FORM Page: 4 of 7 <br /> OFFICIAL INSPECTION REPORT Date: 10/21/13 <br /> Facility Address: Tracy Air Center (TAC) 5749 South Tracy Blvd, Tracy Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> 102. Failed to conduct periodic inspection of aboveground storage tanks (AST). Section 3.1 states visual <br /> inspections are performed monthly and files are kept at the main office of the facility. Each owner/ <br /> operator shall conduct periodic inspections of storage tanks to assure compliance with CFR Part 112. <br /> SPCC Plan lacks written description of how inspection are conducted and how often. Correct by <br /> providing written procedures, conducting regular inspections and maintain documents with the Plan on <br /> site for a minimum of 3 years. Submit copies of all of 2013 monthly inspections to EHD. <br /> 103. Failed to file business plan or annual tank facility statement for capacity >1 OK gallons. Owner or <br /> operator shall file with the SJC EHD a tank facility statement that shall identify name & address of tank <br /> facility, location, size, age, & contents of each storage tank >10K gallon in capacity &that holds <br /> substance >5% of petroleum. Statement will be submitted electronically to CERS (California <br /> Environmental Reporting System) http://cers.calepa.ca.gov under ID# 10187787. Submit this document <br /> electronically within 30 days. <br /> 201, 202. The Professional Engineer (PE) certification is missing and no SPCC Plan was on site. Per <br /> HSC 25270.1.5(a), owner or operator shall prepare in writing and implement a SPCC Plan in <br /> accordance to 40 CFR 112.The PE certification must include all of the aspects in 40 CFR Part 112.3(d) <br /> (1). Immediately obtain a complete PE certification for the facility's Spill Prevention Control and <br /> Countermeasure (SPCC) plan. PE certification must include that PE or agent has visited and examined <br /> the facility, the Plan has been prepared in accordance with good engineering practice, including <br /> consideration of applicable industry standards, is familiar with the applicable requirements of 40 CFR <br /> part 112, established procedures for required inspection and testing is adequate for the facility. Submit <br /> a copy of the completed, certified SPCC plan to the EHD. This plan shall be certified by a PE in <br /> accordance with CFR 112.3(d) and the copy shall be maintained on site. <br /> 301. Failed to amend the SPCC Plan. Section 2.4 states facility has a mobile refueler on site with 750 <br /> gallon Aviation gas & 2500 gallon Jet A gas. As of the second quarter this year, mobile refueler has <br /> been removed from site. Plan must be amended when there is a change in the facility design, <br /> construction, operation, or maintenance, within 6 months of the change, and implemented as soon as <br /> possible, not later than 6 months following preparation of the amendment. Immediately make all <br /> necessary amendments to the SPCC Plan to accurately represent the procedures and policies currently <br /> in place at the facility. Submit a copy of the completed Plan with this revision. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector: Received By: Title: <br /> Thuy Tran (209) 468-8257 Qpm <br /> EHD 23-02-003 Rev 04/19/12 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.