Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd <br /> ABOVEGROUND PETROLEUM STORAGE ACT (APSA) PROGRAM INSPECTION REPORT <br /> CONTINUED <br /> Facility NCPA Facility 2131 W. Turner Rd. Lodi CA 95240 Inspection Jan 21, 2011 <br /> Name: Address: Date: <br /> VIOLATIONS <br /> # V R Code Section HSC=CA Health and SafetyCode,CFR=Code of Federal Regulations;V=Violation,RV=Re violation <br /> Specific requirements of HSC 25270.4.5 a are identified as CFR code sections beginning with 112 <br /> Failed to:test each aboveground container for integrity on a regular schedule or when repairs were made; <br /> 48 CFR 112.8(c)(6) inspect containers and container supports;or keep records of inspections and tests,or provide <br /> equivalence as allowed by CFR 112.7(a)(2) <br /> 49 CFR 112.8(c)(7) Failed to provide effective leakage control through defective internal heating coils,or provide equivalence <br /> as allowed by CFR 11 2.7 a 2) <br /> 50 CFR 112.8(c)(8) Failed to install and regularly test approved liquid level sensing devices,or provide equivalence as allowed <br /> by CFR 112.7a 2 <br /> 51 CFR 112.8(c)(9) Failed to observe effluent treatment facility frequently enough to detect system upsets that could cause a <br /> discharge,or provide equivalence as allowed by CFR 112.7(a)(2) <br /> 52 CFR 112.8(c)(10) Failed to promptly correct visible discharges and/or remove accumulations of oil in diked areas,or provide <br /> equivalence as allowed by CFR 112.7(a)(2) <br /> 53 CFR 112.8(c)(11) Failed to locate portable containers to prevent discharge or provide sufficient secondary containment <br /> capacity that will hold the volume of the largest container plus sufficient freeboard to contain precipitation <br /> Failed to provide buried piping with a protective wrapping and coating and cathodic protection and/or <br /> 54 CFR 112.8(d)(1) inspect buried piping for corrosion damage when exposed,or provide equivalence as allowed by CFR <br /> 112.7(a)(2) <br /> 55 CFR 112.8(d)(2) Failed to cap or blank-flange terminal connection at transfer point and mark its origin when piping is not in <br /> service or in standby service for an extended time,or provide equivalence as allowed by CFR 112.7(a)(2) <br /> 56 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion and corrosion and to allow for expansion and <br /> contraction,or provide equivalence as allowed by CFR 11 2.7 a 2 <br /> 57 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances,or provide equivalence as <br /> allowed by CFR 11 2.7 a 2 <br /> 58 CFR 112.8(d)(4) Failed to conduct integrity and leak test for buried piping at time of installation,modification,construction, <br /> relocation,or replacement,or provide equivalence as allowed by CFR 112-7(a)(2) <br /> 59 CFR 112.8(d)(5) Failed to provide adequate warnings to vehicles entering facility to protect aboveground piping and other <br /> oil transfer operations,or provide equivalence as allowed by CFR 112.7(a)(2) <br /> 999 X Other: See attached"Continuation-Official Inspection Report"for violation(s)not listed above. <br /> On site to perform the routine above ground storage tank inspection. <br /> 18. SPCC plan does not include a complete facility diagram. Describe in your SPCC plan the physical <br /> layout for the facility and include a facility diagram, which must mark the location and content of each <br /> fixed oil storage container and the storage area where mobile or portable containers are located. The <br /> facility diagram must also include all transfer stations and connecting pipes, including intra-facility <br /> gathering lines. Update your plan to include the required information. <br /> 19. SPCC plan did not include a description of the gas compressor lube oil tank and turbine diesel starter <br /> day tank. The plan must address the type of oil in each fixed container and its storage capacity. Update <br /> your plan to include the required information. <br /> 27. SPCC plan did not describe prediction of the direction, rate of flow, and total quantity of oil that could <br /> be discharged. Where experience indicates a reasonable potential for equipment failure, include in your <br /> plan a prediction of the direction, rate of flow, and total quantity of oil which could be discharged from the <br /> facility as a result of each type of major equipment failure. Update your plan to include the required <br /> information. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY <br /> RATE.THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Inspector - Phone: Received gy:./ Title. <br /> (209)468-3453 6 u 7• <br /> EHD 28-02 Rev 2/19/10 Page 3 APSA INSPECTION REPORT <br />