My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2131
>
2800 - Aboveground Petroleum Storage Program
>
PR0535925
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:37:12 AM
Creation date
10/2/2018 11:43:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0535925
PE
2833
FACILITY_ID
FA0009893
FACILITY_NAME
NORTHERN CALIF POWER - LODI
STREET_NUMBER
2131
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2131 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sogov.org/ehd/unitiii.html <br /> CONTINUATION FORM Page: 4 of 4 <br /> OFFICIAL INSPECTION REPORT Date: 01/21/11 <br /> Facility Address: NCPA 2131 W. Turner Rd. Lodi CA 95240 Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS 11,or MINOR-Notice to Comply) <br /> 32 & 99 Facility did not record documentation of the SPCC training received by signing the form in <br /> Appendix B of site SPCC plan. Per the plan on page 31, "Within two weeks of beginning employment at <br /> the combustion turbine site, each new employee is provided with a copy of this spill prevention, control <br /> and countermeasure (SPCC) plan for review. The employee will be required to familiarize himself or <br /> herself with the contents and procedure of the SPCC Plan. When this review is complete, the new <br /> employee will document his or her review by signing the form included in Appendix B." At a minimum, <br /> train your oil-handling personnel in the operation and maintenance'of equipment to prevent discharges: <br /> discharge procedure protocols; applicable pollution control laws, rules, and regulations; general facility <br /> operations; and, the contents of the facility SPCC Plan. Per California Health and Safety Code <br /> 25270.4.5(a) a tank facility subject to this chapter shall prepare and implement the spill prevention <br /> control and countermeasure plan. Correct immediately by implementing the facility SPCC plan, training <br /> site employees, and documenting the employee training per the site SPCC plan. <br /> Note: Site SPCC plan was returned to Vinnie Venethongkham, NCPA Compliance Manager. <br /> Facility will be added on as an above ground storage tank facility. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE($122. <br /> THIS FACILITY I SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector Received By TiU : <br /> EHD 23-02-003 Rev 08/10/10 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.