Laserfiche WebLink
SWRCB, January 2002 Pae I of L <br />Secondary Containment Testing Report Form Ii <br />This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Us the <br />appropriate pages of this form to report results for all components tested. The completed form, written test procedur s, and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: Tracy Truck & Auto Date of Testing: 10/12/2015 <br />Facility Address: 3940 North Tracy Blvd., Tracy CA 95304 <br />Facility Contact: Debbie Jutla Phone: 209-832-5006 <br />Date Local Agency Was Notified of Testing: 04/01/15 <br />Name of Local Agency Inspector (if present during testing): Michelle Henry , <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: Central Petroleum Maintenance <br />Technician Conducting Test: Michael Spring Jr. t <br />itALTFi <br />Credentials: X CSLB Licensed Contractor ❑ SWRCB Licensed Tank Tester <br />Component <br />License Type: C61/D40 License Number: 491948 <br />Manufacturer Training <br />Manufacturer Component(s) <br />Date Training Expires <br />Incon TS -STS Sump Test System <br />08/12/2015 <br />MON <br />3. SUMMARY OF TEST RESULTS <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Test water placed in drums and removed for use as test water. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING I <br />To lire best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requht menu <br />Technician's Signature: N/ <br />l l l <br />P�► Date: <br />Component <br />no <br />Diesel West Secondary <br />MON <br />M1o. <br />0000 <br />onia�a� <br />000a <br />oo�ao <br />0000 <br />000; <br />oaoo <br />ao�d� <br />MM <br />odoo <br />na�o <br />0000 <br />00�0� <br />a000 <br />a <br />opo <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Test water placed in drums and removed for use as test water. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING I <br />To lire best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requht menu <br />Technician's Signature: N/ <br />l l l <br />P�► Date: <br />