Laserfiche WebLink
SWRCB, January 2002 Pae —,- of �" <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer X Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />Other (Spec) <br />Test Equipment Used: Nitrogen with 4" gauge apparatus <br />Piping Run # DSL piping Run # <br />West <br />Piping Material: Fiberglass <br />Equipment Resolution: 0 <br />Piping Run Piping Run # <br />Piping Manufacturer: <br />AO Smith <br />Piping Diameter: <br />4" x 2" <br />Length of Piping Run: <br />150' <br />Product Stored: <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test Boot <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 Minutes <br />- <br />= <br />-° <br />2017 <br />Test Start Time: <br />10:05 AM <br />, t <br />Initial Reading (Ri): <br />5.5 psi <br />Test End Time: <br />11:05 AM <br />Final Reading (RF): <br />5.5 psi <br />Test Duration: <br />1 Hour <br />Change in Reading (RF -RI): <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />Test Result:: `, <br />X Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pas$ ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) _ <br />Tested new split repair boot for diesel west product secondary containment after 6 months <br />