Laserfiche WebLink
1%/ <br /> first-dispenser sump, which has been previously fitted. <br /> Push the pipe out of the sump in the same direction <br /> A � <br /> a - until the mark on the pipe appears outside the sump <br /> �rwall, and cut with a hacksaw. Now pull the other end of <br /> the pipe completely through the sump until both ends <br /> are free. Follow the same procedure for any additional <br /> runs of pipe in the system. <br /> 77r <br /> Step #7: Strip the secondary containment jacket on <br /> both ends,following the same procedure used in the first <br /> dispenser sump. <br /> Step #8: Coat the brass barbs on each swivel fitting <br /> �y,, with Loctite 51$ gasket eliminator and lower the riser <br /> assembiy into the sump. Position one person on either <br /> � '- side of the sump and push each end of pipe through the <br /> j� <br /> flexible entry boors. Make sure that air test boots are <br /> installed on each side. <br /> The two piece compression clamp is tightened with 1/2° <br /> nuts for the 4 bolt version.The 2 bolt version tightens by Push the pipe onto brass swivel fittings applying pressure <br /> threading the bolts directly into the bottom piece of the to both sides equally and moving them back and forth <br /> compression clamp which is tapped and threaded. <br /> and up and down until both ends are flush with the "O" <br /> Continue until compression clamp flanges on both sides ring (if required) at the pipe stops. Now install all two- <br /> are in contact. Always take the clamps metal to metal. piece compression clamps on all fittings and tighten. <br /> Repeat this procedure until all the piping is installed Continue to fit all runs of piping within all sumpss until <br /> within this sump. <br /> - <br /> they are complete. <br /> Step#4:After all risers have been centered, tighten the Step#9: Next, you'll make the final connection at the <br /> band clamps on the flexible entry boots. There should tank sump. Lay the pipe across the top of the tank sump <br /> be at least 3/4" of secondary containment jacket pro- base (if using the three piece sump) and align with the <br /> truding beyond the flexible entry boot inside the sump. pipe stop on the brass swivel, which was previously <br /> installed in the discharge piping of the submersible <br /> Step #5: Now you are ready to move to the next dis- sump. If you are using a one-piece sump, measure the <br /> penser sump in the system. In this dispenser sump, you distance between the sump wall and the pipe stop on the <br /> will be installing a tee. Measure across the top of the dis- swivel fitting and mark the pipe. Now cut off any excess <br /> penser sump and mark the center point. Now pull the and strip the secondary containment jacket, following <br /> slack out of the pipe towards the tanks. the same procedure used on all connections, making <br /> sure the air test boots are installed. If the pipe has the <br /> Hang a riser pipe assembly inside the sump and center, scuff guard, strip it back so it terminates outside the <br /> making sure the brass fittings are facing the entry boos. sump wall. <br /> Step #6: With a felt tipped marker, mark the pipe at After all connections are completed in the tank sumps, <br /> the pipe stop on the brass swivel fitting closest to the return to the dispenser sumps and install all stabilizer <br /> 120 <br />