My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 3:51:36 PM
Creation date
10/4/2018 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 2003
FileName_PostFix
2003
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%W 'ai <br /> bars at the proper locations. Secure all dispenser sump - - The V-200, two inch, vent/vapor recovery piping uti- <br /> lids to the bases with the screws provided and align the lizes standard 2" flexible entry boots for sump entrance <br /> emergency shut-off naives, making sure the shear section and departure, and cur V-300, three-inch pipe utilizes <br /> is at the proper height. standard 3" entry boots. Because the fittings are non- <br /> metallic, connections can be made outside of sumps. <br /> You're now ready to pressure test the primary piping. <br /> To install V-200 or V-300 vent/vapor recovery pipe, fol- <br /> Testing Primary low the same procedure as the product pipe. Roll out the <br /> piping and cut to length, making sure the cut is square. <br /> Poly-Tech pressure piping systems should be tested to 50 If secondarily contained pipe is used, follow the same <br /> to 75 p.s.i, depending on local codes. Normally, 60 p.s.i procedures discussed earlier for removing the secondary <br /> is used. Suction piping systems should be isolated from containment jacket. Vlake sure the proper slope has <br /> the tank and tested to at least 10 p.s.i. been established, with no dips in the trench bedding. <br /> The reinforced nylon king nipples are threaded into <br /> After piping is pressurized. soap all joints and fittings. If required end connections and/or the special VVB Ion- <br /> a leak in the threaded connections are discovered, relieve nection box. (Metal fittings are available as an option <br /> the air pressure, retighten and repressurize. but must be wrapped in protective tape to prevent cor- <br /> rosion if not located in a sump). Use Teflon tape or a <br /> The duration of the air pressure test will vary. Check thick coating of Teflon pipe dope to insure a good seal. <br /> with the local authority or inspector to verify local <br /> Coat the hose barb with Loctite 515 gasket eliminator. <br /> requirements. A minimum of 1 hour should be <br /> observed. The V-200, 2" pipe uses 2 heavy-duty stainless steel <br /> band clamps, while the V-300, 3" pipe uses 3 of these <br /> After the primary piping pressure test is complete, make <br /> sure all secondary air test boots are slid forward, allow- <br /> clamps. <br /> ing the secondary jacket to be open to the atmosphere, Measure back from the end of the pipe and mark for <br /> allowing any liquid in the sumps or secondary contain- <br /> clamp placement. Mark the 2" pipe at 3/4 in. (2 cm.) <br /> meet jacket to drain to the low point in the system, <br /> where leak detection sensors should be installed. and 2 in. (5 cm.). Slide the two band clamps onto the <br /> pipe and lever the pipe fully onto the barb. Place the <br /> clamps just behind the marks, and tighten firmly using <br /> Vent/Vapor Recovery <br /> a 5/16" socket or nutdriver. <br /> _ . <br /> Piping Installation i <br /> Another area to cover is our V-200 and V-300 '' <br /> vent/vapor recovery piping. If the installation requires <br /> }Y1 t l <br /> Stage II, vapor recovery piping can be installed with <br /> these products. as well as the tank vents required on <br /> every installation. <br /> 7i <br /> The V-series vent and vapor recovery piping goes in just <br /> as quick and easy as our product piping, and can be <br /> For clamp placement on V-200,mark back at 3/4 inch and <br /> installed before or after the product piping. 2 inches.Place the clampsj=in front of these marks and <br /> tighten Finely 121 <br />
The URL can be used to link to this page
Your browser does not support the video tag.