Laserfiche WebLink
You may decide to pull the pipe through the sumps or the scuff guard !aypr and tear ii.away from the inner rec- <br /> over the top of them. If you choose to pull through the ondary containment jacket. Now re;nm, the band <br /> sumps, and you have installed the entry boots in the clamp. <br /> sumps, spray or coat the outside of the pipe with a soapy <br /> water mixture and insert into the first entry boot. Now l <br /> push the pipe through until it departs through the entry <br /> boot on the other side. Continue feeding [he pipe ti <br /> through each dispenser while applying soap solution as I ._ s <br /> the pipe is pulled, until you reach the tank sump. <br /> Go back to the spool and cut the pipe at the center, <br /> where the pipe crosses over the first dispenser sump. <br /> Continue pulling each run of pipe in the same manner. . <br /> Y. <br /> Preparing Secondary,jacket <br /> Secondarily Contained Piping Only <br /> Now you are ready to prepare the pipe to perform an air - <br /> test on the secondary containment jacket. <br /> Step #1: The first step is to remove the outer scuff <br /> guard from the secondary containment jacket.With dis- <br /> penser sumps you will need to measure back 9" from +� <br /> one end of the pipe and mark.This will align the cut- <br /> back of the scuff guard even with the sump wall. Note: _`k�7-' <br /> the 9" cut-back requirement will vary with tank sumps <br /> based on the length of pipe inside the sump. Installers Seep l -Removing the outer scuff guard. <br /> need to ensure that the scuff guard is even or outside <br /> the sump wall. Remove a band clamp from one of the Step #2: (this step applies to all SC pipe sizes) Measure <br /> entry boots and slide the band clamp over the end of the back 4"" from end of the pipe and mark with the felt <br /> pipe, align with the mark and tighten just enough so it tipped marker. Open the APT secondary containment <br /> won't slip. jacket stripping tool and fit it around the outside of the <br /> pipe at the 4""' mark. Be veru careful when handling <br /> Utilizing the utility knife with a straight blade, and this tool. as the blades are extremely sharp <br /> using the band clamp as a guide, trace against the band <br /> clamp on the mark just deep enough to score the scuff <br /> guard layer. (The band clamp will be a guide to tear <br /> against). Practice on a scrap of pipe until you can do this ,F <br /> without cutting into the secondary jacket below. Now, <br /> go to the end of the pipe and make a cut through the <br /> outer scuff guard layer approximately 2" long, (This <br /> part of the secondary below the scuff guard will be cut - <br /> off too, so it is okay to touch this layer with the blade). <br /> ." <br /> Insert the utility knife blade under the outside scuff <br /> guard layer at an angle, and make one cut down to the <br /> band clamp. The inner surface of the scuff guard layer <br /> will consist of a shiny metallic layer. Grasp one side of 117 <br />