My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 3:51:36 PM
Creation date
10/4/2018 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 2003
FileName_PostFix
2003
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY Unit Supervisors <br /> Donna K.HeranR.E.xs' 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> DirectorrMike Huggins,R.E.H.S.,R.D.I. <br /> Al Olsen,R_ . <br /> Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> �.. Program Manager Telephone: (209) 468-3420 Margaret Lagono,R.E.H.S. <br /> a<i c oaaP• Laurie A.Cotulla,R.E.H.S. Robert McClellon,R.E.H.S. <br /> Fax: (209) 464-0138 Mark Barcellos,R.E.H.S. <br /> Program Manager <br /> TO: INSTALLERS AND OWNERS OF NEW UNDERGROUND STORAGE TANKS <br /> San Joaquin County Environmental Health Department (EHD) has established the following <br /> guidelines to assist you in the completion of your construction project. The guidelines specify the <br /> construction and monitoring criteria necessary to complete our review of your proposed underground <br /> storage tank (UST) system. <br /> 1 el IRIMMIAI OF PLANS <br /> INSTALLATION: <br /> a. Submit 3 complete sets of drawings illustrating the locations of all existing and <br /> proposed structures, including existing UST(s), in non-erasable print to EHD. Upon <br /> approval, one set will be retained by EHD and the other two will be returned. <br /> Include equipment and material specification sheets and manufacturer's brochures <br /> describing field testing procedures, operating and monitoring systems and listing <br /> numbers or other evidence of a nationally recognized testing organization approval. All <br /> proposed leak detection methods and equipment must meet the requirements specified <br /> in 40 CFR 280.40 and have been reviewed by the State Water Resources Control <br /> Board Staff. <br /> C. All interstitial monitors must perform according to manufacturer's standards, and must <br /> be tested annually in accordance with section 2630 (d), California Code of Regulations <br /> (CCR), Title 23 Waters, Division 3, Chapter 16. <br /> d. Include a detailed monitoring and response plan in accordance with section 2632 (d) (1) <br /> & (2), CCR, Title 23 Waters, Division 3, Chapter 16. <br /> e. The plans should include a cross sectional diagram of the tank and piping system <br /> including secondary containment, overflow protection equipment, and extension of all <br /> pipes and/or ports from below grade to finish grade. <br /> f. Submit a completed "EHD Service Request' form and the State Water Resources <br /> Control Board "Facility Permit (A)" and "Tank Permit (B)" application forms. <br /> SITE MITIGATION: <br /> a. In the event contamination is observed, confirmed or suspected as a result of a leaking <br /> UST system it is the responsibility of the owner or operator to submit a workplan to EHD <br /> Site Mitigation Unit prior to initiating any assessment or remediation activities. To <br /> minimize delays, a Corrective Action Plan may be submitted concurrent with tank <br /> closure or installation plans. Address one copy of the Corrective Action Plan to the Site <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.